Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Beredningsarbete i området Ärentuna, Uppsala på linje 06
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2021 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Preparation of distribution grid in the area Ärentuna, Uppsala on line 06 (English)
Abstract [sv]

Detta examensarbete behandlar tillvägagångssättet för ett beredningsarbete på Trolk El & Tele AB både på högspännings- och lågspänningsnät. Beredningen i detta examensarbete avser ett lokalnät i Ärentuna, Uppsala. Det befintliga hög- och lågspänningsnät som idag finns i området är gammalt och till stor del luftburet vilket ska raseras och ersättas med mestadels markbundet kabelnät. Ombyggnaden görs för att öka driftsäkerheten i områdetvilket innebär färre störningar och avbrott. Projektet har inneburit kartstudier för att ge projektmedlemmarna en översiktsbild över området. Efter att kartstudierna hade genomförts utfördes ett fältbesök för att ge en tydligare bild av området samt för att kunna upptäcka problem och hinder som var svåra att se på kartor. Eftersom vägen för kabelförläggningen kunde väljas kunde hinder och problem undvikas i stor mån, dock krävs styrd borrning på sex platser för att korsa en järnväg samt fem vägar. Projektet omfattar rasering av 8304 meter högspänningsledning och 3277 meterlågspänningsledning. Sex nätstationer varav fyra stolpstationer raseras och ersätts med sex nya markstationer i storlekarna 100-, 200- och 315 kVA. 7139 meter högspänningskabel, 3533 meter lågspänningskabel samt 273 meter lågspänningsluftledning förläggs samt sex nya kabelskåp anläggs. Projektet berör 125 abonnenter. Enligt en P2-kalkyl uppgår den totala kostnaden för ombyggnaden i området till 6,18 mnkr.

Abstract [en]

This thesis is about the approach how the prepatory work on Trolk El & Tele AB for both high and low voltage power grids. The conduct preparations refers to a local network in Ärentuna, Uppsala. The existing high and low voltage network that currently exists in the area today is old and largely overhead power lines, which will be demolished and replaced with mostly underground cable grid. The rebuilding is done to increase the reliability in the area, which means fewer disruptions and interruptions. The project has involved map studies to give the project members an overview of the area. After the map studies had been carried out, a field visit was carried out to give a clearer picture of the area and to be able to discover problems and obstacles that were difficult to see on maps. As the route for the cable routing could be chosen, obstacles and problems could be avoided to a large extent, however, controlled drilling is required at six locations to cross a railway and five roads. The project includes the demolition of 8304 meters of high voltage line and 3277 meters of low voltage line. Six network stations, of which four pole stations, will be demolished and replaced with six new substations in the sizes of 100, 200 and 315 kVA. 7139 meters of high voltage cable, 3533 meters of low voltage cable and 273 meters of low voltage overhead line are laid and six new cable distribution cabinets are set up. The project affects a total of 125 subscribers. According to a p2 calculation, the total cost of the reconstruction within the area amounts to 6,18 million SEK.

Place, publisher, year, edition, pages
2021. , p. 30
Keywords [sv]
Beredningsarbeten, elkraft
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-16737Local ID: EXH300OAI: oai:DiVA.org:hv-16737DiVA, id: diva2:1581214
Subject / course
Electrotechnology
Educational program
Högskoletekniker, elkraft
Supervisors
Examiners
Available from: 2021-07-21 Created: 2021-07-20 Last updated: 2025-09-30Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 235 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf