SAIDI-påverkan på grund av oselektiva felbortkopplingar: en analys baserad på Vattenfall Eldistribution AB:s nät
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2020 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
The effect on SAIDI by selectivity issues in power systems (English)
Abstract [sv]

Energimarknadsinspektionen ställer krav på elnätsbolagen vad gäller elkvalitet. Varje år ska såväl aviserade som oaviserade avbrott rapporteras. Dessa avbrott anges med hjälp av avbrottsindikatorerna SAIDI (System Average Interruption Duration Index) och SAIFI (System Average Interruption Frequency Index), vilka skildrar medelavbrottstid per kund och medelavbrottsfrekvens per kund för ett aktuellt nätområde.

Detta examensarbete genomfördes med Vattenfall Eldistribution AB som uppdragsgivare. Studiens syfte är för att undersöka hur oselektiva felbortkopplingar bidrar till att påverka det årliga SAIDI-resultatet. Då företaget strävar efter att uppnå sitt SAIDI-mål krävs en klarläggning över vilka faktorer som ger upphov till ett förhöjt SAIDI och undersöka om dessa kan reduceras. De felbortkopplingar som analyserats är sådana som orsakats av felaktig utlösning av brytorgan samt felbortkopplingar i samband med provningar, för avbrott som varat längre än tre minuter.

De komponenter i elnätet som ansvarar för feldetektering och felbortkoppling är reläskydd, dessvärre känner de inte alltid av alla fel, ibland är de felkonfigurerade och felet kopplas inte bort av det avsedda reläskyddet, alltså felet kopplas bort oselektivt. Oselektiva felbortkopplingar kan också bero på att reläskyddet upptäckt felet och skickat en utlösningsimpuls, men någon annan komponent i kontrollanläggningen är trasig och felet kan därför inte kan kopplas bort med hjälp av det avsedda skyddet.

Det resultat som framkommit är att oselektiva felbortkopplingar har en betydelsefull påverkan på det årliga totala SAIDI-resultatet som rapporteras in till Energimarknadsinspektionen. Felorsakerna som ligger till grund för de felbortkopplingar som kunnat analyseras är bland annat begränsningar i reläskydden. Utifrån studiens resultat kan slutsatserna dras att det kan vara lönsamt för Vattenfall Eldistribution AB att undersöka eventuella investeringar, för att minska SAIDI för oselektiva felbortkopplingar. Till exempel kan äldre komponenter som saknar möjlighet för omkalibrering bytas ut och befintliga som är möjliga att kalibrera kan kalibreras om för att erhålla förbättrad funktion.

Abstract [en]

Swedish Energy Markets Inspectorate has requirements on the electrical distribution companies regarding power quality. Both power failure and planned interruptions in the distribution of electricity is to be reported annually. These interruptions are measured by SAIDI (System Average Interruption Duration Index) and SAIFI (System Average Interruption Frequency Index). These indexes narrate the average interruption duration or interruption frequency per electrical costumer per year, in a certain area.

This thesis was made on the behalf of Vattenfall Eldistribution AB (VEAB). The purpose of this study was to analyze the annual effect on SAIDI by selectivity issues in power systems. If VEAB wants to reach the SAIDI-goal it is necessary for a study to be carried out. The study should investigate what factors that contributes to an increased SAIDI because of selectivity issues.

The analyze involved interruptions that had been caused by an incorrect operation of the protection systems and interruptions due to testing of these systems. Only interruptions that lasted longer than three minutes was considered.

There are components in power systems which are supposed to disconnect the faulty part, they are called protection relays. Unfortunately, they do not detect all faults that occur in the power system. For example, the protection systems can be wrongly configurated and the faulty part will not be disconnected in a properly way.

The result of the study is that selectivity issues have a significant effect on the annual SAIDI that is reported to Swedish Energy Markets Inspectorate. One of the main reasons to selectivity issues are for example limitations in the protection relays. In conclusion, Vattenfall Eldistribution AB can profit from an investment to decrease SAIDI that is affected by selectivity issues. Older components that lacks the calibration feature could be replaced, and already existing ones that have such a calibration feature could be re-calibrated.

Place, publisher, year, edition, pages
2020. , p. 51
Keywords [en]
SAIDI, electrical distribution companies, power interruptions, power quality, protection relays
Keywords [sv]
Oselektiva felbortkopplingar, elnätsbolag, SAIDI, elkvalitet, reläskydd
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-15084Local ID: EXE511OAI: oai:DiVA.org:hv-15084DiVA, id: diva2:1416620
Subject / course
Electrotechnology
Educational program
Elektroingenjör - Elkraft
Supervisors
Examiners
Available from: 2020-04-03 Created: 2020-03-24 Last updated: 2025-09-30Bibliographically approved

Open Access in DiVA

fulltext(1272 kB)989 downloads
File information
File name FULLTEXT01.pdfFile size 1272 kBChecksum SHA-512
6785a056fb0dafc4dd3e87189ab0dd598bb080183f7f1adb5ad8eb9baf4e954a55afbf3358f31ed65ce44544b726a4833d7b8a51fdba350134e845f2e9182793
Type fulltextMimetype application/pdf

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 995 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 643 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf