Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Nätplan för fördelningsstation M4 Torsby
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2016 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Network plan for electric substation M4 Torsby (English)
Abstract [sv]

Det här examensarbetet är utfört på uppdrag av Kungälv Energi AB. Syftet med arbetet är att upprätta en nätplan för området M4 Torsby som kan användas som underlag till investeringar. Nätplanen innehåller en geografisk beskrivning som ger en överblick av markförhållanden, en tillståndskontroll av nätet vid normal- samt reservdrift, kontroll av nätets prestanda vid framtida lastökning samt åtgärdsförslag.

M4 Torsby är ett landsbygdsnät bestående av fem linjer som matar totalt 1949 kunder. Beräkningar som utförts i Kungälv Energis beräkningsprogram dpPower visar att på linje L403 finns det en Cu 10 friledning som är överbelastad vid normaldrift. I nätet finns även överbelastade transformatorer.

Reservdrift i området kan hanteras på alla linjer förutom på linje L401 vid det specifikt valda beräkningsfallet. Undersökning av nätets framtida prestanda har beräknats enligt Kungälv Energis och Kungälv Kommuns planer för området. Även extra last har adderats för att få en högre belastningsökning än de redan planerade. Resultaten visar att nätet klarar denna belastningsökning i normal- och reservdrift förutom då K406 reservmatar stor del av L401. En ACJJ50 kabel i Kärna centrum överbelastas.

Arbetet resulterade i åtgärdsförslag för transformatorer samt placering av nya frånskiljare för bättre sektionering av nätet. Även ett åtgärdsförslag på den ACJJ50 kabel som kan bli överbelastad vid framtida reservdrift har framställts.

Abstract [en]

This thesis is made on behalf of Kungälv Energi AB. The purpose of the thesis is to establish a network plan for the area M4 Torsby that can be used as a foundation for reconstruction and investments in the area. The network plan contains a geographical description that provides an overview of the area including ground conditions and nature reserves. It also procures condition monitoring of the power network to detect its strengths and weaknesses in normal and reserve operation. To detect if the network can handle future loads a simulated scenario has been made.

M4 Torsby consists of five lines which supply 1949 customers. Calculations show that a specific part of line L403 and some transformers around the area are overloaded during normal operation. The area can be alternately supplied. Calculations on the simulated future show that the network can handle future loads in both normal and reserve operation if the overloaded part of L403 is upgraded.

Place, publisher, year, edition, pages
2016. , p. 34
Keywords [en]
network plan, electric substation
Keywords [sv]
nätplan, fördelningsstation
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-9804Local ID: EXH300OAI: oai:DiVA.org:hv-9804DiVA, id: diva2:955377
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2016-08-26 Created: 2016-08-25 Last updated: 2016-08-30Bibliographically approved

Open Access in DiVA

fulltext(1983 kB)300 downloads
File information
File name FULLTEXT01.pdfFile size 1983 kBChecksum SHA-512
ab68a6ea2f7489ff8fcc8240ff7233b4600f7da31fdf86efda5a981d3ae055ae18b54e4e39fc21d8f459e86731d1ad89d9747c41d0dc17a8a46ac23d22028269
Type fulltextMimetype application/pdf

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 300 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 384 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf