Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förslag på utformning av en monteringscell för att öka produktionskapaciteten: för VP1-pumpar på Parker Hannifin AB
University West, Department of Engineering Science, Division of Mechanical Engineering and Natural Sciences.
University West, Department of Engineering Science, Division of Mechanical Engineering and Natural Sciences.
2016 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Design proposal of an assembly cell to increase production capacity : for VP1 pumps at Parker Hannifin (English)
Abstract [sv]

Detta examensarbete har genomförts på Parker Hannifin AB i Trollhättan och beskriver arbetet för att ta fram utformningsförslag för en monteringscell där en hydraulisk pump produceras. Den nuvarande monteringscellen har inte en tillräckligt hög produktionskapacitet för att tillgodose en stigande efterfrågan. Syftet med arbetet var att föreslå en balanserad monteringscell vars kapacitet ökar vid ökning av personalstyrkan. Målet var att visa upp en modell av en monteringscell som kan uppnå en produktionskapacitet på minst 200 pumpar per vecka. Genom att observera dagens montering och tidsåtgången för de olika momenten skapades tidsbalanseringar. Till skillnad från dagens tidsbalanseringar inkluderas också arbetsmomenten för att säkerställa och kalibrera den hydrauliska funktionen och pumpens inställningar i en testrigg. Utformningskoncept av monteringscellen skapades och diskuterades med intressenter vilket följdes av omarbetningar av koncepten innan en sållning. Koncepten sållades ner till två koncept, vilka modellerades i full skala för att möjliggöra utvärdering enligt arbetsmetoden Production Preparation, 2P. Därefter skapades en konceptpoängsmatris och koncepten betygsattes med hjälp av utvärderingen av modellerna.Konceptet som rekommenderas till Parker kallas "Tvåsidig montering" och är ett koncept där majoriteten av delmontagen av en VP1-pump utförs på en sida av konstruktionen för att därefter transporteras på en rullbana över till den andra sidan där en mindre mängd delmonteringar sker för att efterföljas av en slutmontering. Konceptet, med dess exempel på tidsbalansering och bemanning, resulterar i en produktionskapacitet på 227 pumpar i veckan och därmed uppfylls målet på 200 pumpar i veckan. Konceptet är flexibelt och kan anpassas till flera arbetsstandarder och det finns utvecklingspotential om det bedöms lämpligt av Parker att implementera.

Abstract [en]

This work has been carried out at Parker Hannifin in Trollhättan and is describing concept work for design proposals of an assembly cell in which a hydraulic pump is produced. The current assembly cell does not have a high enough capacity to meet a rising demand. The aim of this work was to propose a balanced assembly cell whose capacity increases with increase in the workforce. The goal was to present a model of an assembly cell that can achieve a production capacity of at least 200 pumps per week.By observing the current assembly, and study the various operations time duration, different time balancing charts were created. Unlike the current time balancing charts the operations for calibrating and controlling the pumps functions in a test rig were now included. Various concepts were created and discussed with stakeholders and were followed by revisions of the concepts before a screening. The concepts were screened down to two concepts, which were modeled in full scale to allow for evaluation according to the working method Production Preparation, 2P. After that, a concept point matrix was created and the concepts were rated with the use of the evaluation of the models.The concept recommended to Parker is called "Two-sided assembly" and is a concept where the majority of the sub-assemblies for building a VP1 pump is made on one side and then transported on a roller conveyor to the other side where a smaller amount of sub-assemblies is made to be followed by the final assembly.The concept with the examples of time balancing charts results in a production capacity of 227 pumps per week. The concept is flexible and can be adapted to several workflow standards and there is potential for further development if the concept is deemed suitable to implement by Parker.

Place, publisher, year, edition, pages
2016. , 41 p.
Keyword [sv]
Produktionskapacitet, Parker Hannifin
National Category
Reliability and Maintenance
Identifiers
URN: urn:nbn:se:hv:diva-9427Local ID: EXM502OAI: oai:DiVA.org:hv-9427DiVA: diva2:941526
Subject / course
Mechanical engineering
Educational program
Maskiningenjör
Supervisors
Examiners
Available from: 2016-06-22 Created: 2016-06-21 Last updated: 2016-06-22Bibliographically approved

Open Access in DiVA

No full text

By organisation
Division of Mechanical Engineering and Natural Sciences
Reliability and Maintenance

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 37 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf