Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Små och okomplicerade projekt inom infrastrukturplanering: En studie i hur Trafikverket använder typfall 1
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Small and uncomplicated projects in infrastructure : A study in how Trafikverket uses typfall 1 (English)
Abstract [sv]

Fysisk planering av land och vatten är en viktig del av ett samhälles struktur och utveckling. Samhällsplaneringen är en demokratisk process, reglerad av flertalet lagar och den ska bidra till en hållbar livsmiljö ur ett socialt, ekologiskt och ekonomiskt perspektiv.

Trafikverket är den myndighet i Sverige som ansvarar för planering av infrastruktur. Enligt väglagen och lagen om byggande av järnväg ska den som avser att bygga ny infrastruktur upprätta en väg- eller järnvägsplan, vilket ofta är en lång och kostsam process. Den 1 januari 2013 infördes ändringar i lagstiftningen för att undanta små och okomplicerade åtgärder från den formella planprocessen med avsikten att effektivisera infrastrukturplaneringen. De här projekten fick benämningen typfall 1 i Trafikverkets planeringssystem.

Syftet med studien är att undersöka hur lagändringarna från 2013 har använts i planläggningsarbetet hos Trafikverket. Studien avser att undersöka vilken typ av projekt lagändringarna applicerats på och hur projekten överensstämmer med avsikterna att de ska vara små och okomplicerade. Den ska även skapa en inblick i hur förändringarna tagits emot och uppfattas av de som arbetar med infrastrukturplanering.

De metoder som använts för att besvara frågeställningarna är dokumentstudie och fokuserad intervju. Dokumentstudien inbegriper alla planerade projekt från Region Väst mellan 1 januari 2013 och 31 december 2014. Intervjuerna har genomförts med projektledare och konsulter som alla har erfarenhet av planering av små och okomplicerade projekt.

Resultatet visar att Trafikverket främst använder lagändringen för att anlägga busshållplatser, vänstersvängfält och cirkulationsplatser, samt att betydligt fler åtgärder har utförts på väg än på järnväg. Projekten varierar i omfattning då de nya riktlinjerna har blivit tolkade på olika sätt.

Slutsatsen är att lagändringarna har bidragit till en effektivare planprocess. Intervjusvaren visar att inställningen till att genomföra mindre projekt utan formell plan huvudsakligen är positiv. De visar även att det krävs tydligare riktlinjer för hur beställningar och bakgrundsmaterial till projekten ska vara utformade.

Abstract [en]

Spatial planning of land and water is an important part of a community’s structure and development. Community planning is a democratic process, regulated by several laws and it’s contributing to a sustainable living environment from a social, ecological and economic perspective.

Trafikverket (The Swedish Transport Agency) is the authority in Sweden which is responsible for infrastructure planning. According to the Swedish Road Law and Railway Law, the one intending to build new infrastructure, must establish a road or railway plan, which often is a long and costly process. In January 1, 2013 changes were introduced in to the law to exclude small and uncomplicated projects from the formal planning process, to create a more effective infrastructure planning system. These small projects were given the name type case 1 (typfall 1), in the planning system of Trafikveket.

The purpose of the study is to examine how the changes in the law from 2013 have been used in the planning process by Trafikverket. The study intends to investigate which type of project the law changes has applied on and how they conform with the intentions that they should be small and uncomplicated. It will also investigate how the changes are received and perceived by those involved in infrastructure planning.

The methods used to answer the questions is document study and focused interviews. The documents study includes all the planned projects from Region Väst (Western Region) from 1 January 2013 to 31 December 2014. The interviews were conducted with project managers and consultants who all have experience in the planning of small and uncomplicated projects.

The results shows that Trafikverket mainly uses the new changes in the law to build bus stops, left fields and roundabouts, and it has been applied to significantly more road projects than railway projects. The projects is varying in size since the new guidelines have been interpreted in different ways.

The conclusion is that changes in the law have contributed to a more efficient planning process. The project managers overall have a positive attitude to implement smaller projects without a formal plan, but the guidelines on witch background material needed for a project should be more clear.

Place, publisher, year, edition, pages
2015. , p. 43
Keywords [en]
Community Planning, planning process, Trafikverket, Swedish Transport Agency, Road, Railway, Road Law, Railway Law, Typfall 1
Keywords [sv]
Samhällsplanering, Planprocess, Trafikverket, Väg, Järnväg, Väglagen, Lagen om byggande av järnväg, Typfall 1
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:hv:diva-8245Local ID: EXM504OAI: oai:DiVA.org:hv-8245DiVA, id: diva2:856839
Subject / course
Land surveying
Educational program
Lantmäteriingenjör
Supervisors
Examiners
Available from: 2015-09-28 Created: 2015-09-25 Last updated: 2015-09-28Bibliographically approved

Open Access in DiVA

fulltext(765 kB)1476 downloads
File information
File name FULLTEXT01.pdfFile size 765 kBChecksum SHA-512
e98f4bf430bd336befea847ae7a25421dffb070517036c31a80c33fa0ebe82bc8fc0af082bddd428c130117821946e9b53a5bab41dd38c8be94ab7e5b7f4b126
Type fulltextMimetype application/pdf

By organisation
Division of Computer, Electrical and Surveying Engineering
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1485 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 807 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf