Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Plan- och bygglagen: En planprocess i förändring?
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Kommunen har ansvaret för att planera mark- och vattenanvändningen inom den egna kommunen. Kommunen bestämmer genom sitt planmonopol var och vad som får byggas. Idag finns i delar av landet problem med bostadsbrist som delvis är en konsekvens av att vårt samhälle har genomgått stora förändringar. De förändringar som i stort har skett är hushållens sammansättning, åldersfördelningen och den geografiska fördelningen av befolkningen. Härtill kommer att det inte byggs nya bostäder i tillräckligt stor utsträckning. Med anledning av detta har flera utredningar och studier genomförts under åren för att identifiera vilka led i planprocessen som tar tid för att komma till rätta med utdragna planprocesser. Syftet har varit att ta fram lösningar på de problem som identifierats för att kunna snabba på och effektivisera planprocessen likväl som att förenkla lagstiftningen. Brister i tillämpningen är ytterligare en anledning till att förenkla lagstiftningen men samtidigt behöver kompetensen ökas inom både kommunen och staten. Insatser för kompetensutvecklingen har gjorts av bland annat Boverket och insatserna är även tänkta att fortsätta. Frågan är då om det lett till någon förändring av planprocessen?Studien syftar till att beskriva planprocessens utveckling för att försöka ta reda på om de ändringar i lagstiftningen som gjorts sedan plan- och bygglagen vann laga kraft år 1987 har lett till någon förändring. Syftet är samtidigt att försöka ta reda på om standardförfarandet kommer att kunna tillämpas i större utsträckning och om det innebär en snabbare process. Eftersom kommunerna och länsstyrelsen har en viktig roll i planprocessen kan deras synpunkter på planprocessen bidra till insyn i olika delar av processen och kommunernas syn på ändringarna. För att inhämta länsstyrelsens och kommunernas synpunkter genomfördes empiriska undersökningar. För datainsamling till teoridelen har i huvudsak relevant lagstiftning och förarbeten studerats. Studien är både en kvantitativ och en kvalitativ studie då både kvantitativa och kvalitativa data presenteras i rapporten.Resultatet av studien är att kommunerna själva inte tycker att någon större förändring av planprocessen har skett. Vissa förändringar har trots allt skett även om det varit vid olika tillfällen över lång tid och i liten dos åt gången. Ändringarna i lagstiftningen ha lett fram till, om inte en snabbare, så åtminstone en mer funktionell planprocess och en tydligare lagstiftning. Slutsatsen är att det egentligen inte spelar någon roll vilket förfarande som tillämpas utan att det till syvende och sist handlar om varje enskild detaljplans komplexitet. Att uppnå högsta möjliga effektivitet innebär att uppnå minsta möjliga tidsåtgång utan att det påverkar kvaliteten och där är planprocessen inte än.

Abstract [en]

The municipality is responsible for planning land and water use within the municipality. The municipality determines, through its planning monopoly was and what gets built. Today, there are parts of the country problems with the housing shortage that is partly a consequence of our society has undergone great changes. The changes have largely been the household composition, age distribution and geographical distribution of the population. In addition, there are built new homes sufficiently. For this reason, several investigations and studies conducted over the years to identify which part of the planning process that takes time to come to terms with lengthy planning processes. The aim has been to develop solutions to the problems identified in order to speed up and streamline the planning process as well as to simplify legislation. Weaknesses in the application is another reason to simplify the legislation but also need the skills increased in both the municipality and the state. Efforts skills development has been made by, among other things, Building and Planning and the stakes are even supposed to continue. The question then is whether it led to any change in the planning process?The study aims to describe the plan development of the process of trying to find out about the legislative changes made since the Planning and Building Act became final in 1987, have led to any change. The aim is also to try to find out whether the standard procedure will be applied more widely and if that means a faster process. Since the municipalities and the provincial government has an important role in the planning process, their views on the planning process contribute to transparency in various parts of the process and the municipalities to the amendments. To obtain county administrative and local views was conducted empirical studies. Data collection for the theoretical part is mainly relevant legislation and preparatory works studied. The study is both a quantitative and a qualitative study where both quantitative and qualitative data presented in the report.The result of the study is that municipalities themselves do not think that any major change in the planning process has taken place. Some changes have nevertheless taken place even if it has been at various times over a long period and in small dose at a time. Changes in legislation have resulted, if not faster, so at least one more functional planning process and a clearer legislation. The conclusion is that it really does not matter which procedure applies without ultimately is about every single detail plans complexity. To achieve the highest possible efficiency means achieving minimum time consumption without affecting quality, and there is the planning process is not yet.

Place, publisher, year, edition, pages
2015. , p. 98
Keywords [sv]
Planprocess, detaljplan, förfarande, plan- och bygglagen, kommunen, PBL, ÄPBL
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hv:diva-8210Local ID: EXM504OAI: oai:DiVA.org:hv-8210DiVA, id: diva2:855876
Subject / course
Land surveying
Educational program
Lantmäteriingenjör
Supervisors
Examiners
Available from: 2015-09-25 Created: 2015-09-22 Last updated: 2015-09-28Bibliographically approved

Open Access in DiVA

fulltext(1907 kB)663 downloads
File information
File name FULLTEXT01.pdfFile size 1907 kBChecksum SHA-512
213dae3e1195b2b61227f75354ee5e124ebe9acce33c12cf83a6d7484697c9402bbf7df6c149cb3711478a452a3707c1871961a27f83a03d199bc6b965090014
Type fulltextMimetype application/pdf

By organisation
Division of Computer, Electrical and Surveying Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 664 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1000 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf