Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Riskbedömning och underhållsstrategier för ABB:s högeffektlaboratorium i Västerås
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Risk assessment and maintenance strategies for ABB's High Power Laboratory in Västerås (English)
Abstract [sv]

Inom de närmsta åren står ABB:s högeffektlaboratorium i Västerås inför omfattande reinvesteringar. För att underlätta vid beslutsarbetet, samt lägga grunden till optimala underhållsprogram vid nyanskaffning, är det viktigt med en tydlig underhållsstrategi samt metoder för att bedöma de risker som kan knytas till olika anläggningsdelar. Rapporten syftar till att lyfta fram sådana strategier och metoder för riskbedömning.Arbetet bedrivs i form av en litteraturstudie inom ämnesområdena riskhantering och underhållsteknik, följt av en kvalitativ studie av de förhållanden som råder i anläggningen. Resultatet är en underhållsstrategi, med utgångspunkt i ABB Corporate Researchs övergripande affärsstrategier, där kvalitativa riskbedömningar används som beslutsunderlag för underhållschemat. Genom att dela in anläggningens olika enheter i riskklasser kan underhållsinsatserna anpassas utefter de ekonomiska och arbetsmiljömässiga risker som dessa medför. Det datoriserade underhållssystemet står för den sammanhållande strukturen, därför är det av stor vikt att systemets information är korrekt, komplett och sökbar.Vid högeffektlaboratoriet används ofta riskbedömningar som ett verktyg i det löpande arbetsmiljöarbetet, dessutom är tillgången på teknisk kompetens inom ABB Corporate Researchs egen personal god. Mot bakgrund av detta ser förutsättningarna goda ut för en implementering av kvalitativa riskbedömningar i underhållsarbetet.

Abstract [en]

In the upcoming years, ABB's high power laboratory in Västerås is facing a period of reinvestments. In order to facilitate the decision-making, and to lay the foundation to effective maintenance programs for new equipment, it is important to have a clearly defined maintenance strategy, including methods to adequately assess the plant and its risk factors. The aim of this report is to suggest such strategies and risk assessments methods.A literature study of maintenance engineering, followed by a qualitative study of the high power laboratory's prerequisites, leads up to a maintenance strategy based on the primary business strategies of ABB Corporate Research. Assigning a risk class to different components enables a risk-adapted maintenance schedule to be deployed. These risk classes are the weighted result of qualitative risk assessments that includes both economic and human consequences. The cohesive structure in this strategy is the Computerized Maintenance Management System (CMMS), hence the importance of its data being thorough, complete and searchable.At the high power laboratory, risk assessments in areas related to personal safety is commonly used, and the technical skills within ABB Corporate Research's own personnel is high. Thus, the step of implementing a qualitative risk assessment approach to maintenance management should be fairly straight forward.

Place, publisher, year, edition, pages
2015. , p. 37
Keywords [en]
maintenance, ABB, risk assessment, strategy, personal safety, dependability
Keywords [sv]
underhållsteknik, ABB, riskbedömning, underhållsstrategi, personsäkerhet, driftsäkerhet
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-8189Local ID: EXC585OAI: oai:DiVA.org:hv-8189DiVA, id: diva2:855688
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2015-09-25 Created: 2015-09-22 Last updated: 2015-09-28Bibliographically approved

Open Access in DiVA

fulltext(1263 kB)1211 downloads
File information
File name FULLTEXT01.pdfFile size 1263 kBChecksum SHA-512
ef33ee79748f0c1fd500ff230522fa23945679a41d59a92a5d477b01b956b057db08d5a1e3509d1654ac72d2741e55e7844b4c69f2e7301790923b3733541904
Type fulltextMimetype application/pdf

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1214 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 346 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf