Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Optimering av logistiken för TT3 Topp modulerna på Uddevalla Finmekanik AB
University West, Department of Engineering Science, Division of Mechanical Engineering and Natural Sciences.
University West, Department of Engineering Science, Division of Mechanical Engineering and Natural Sciences.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Optimize the logistics of TT3 Topp modules at Uddevalla Finmekanik AB (English)
Abstract [sv]

Under våren 2015 genomfördes ett examensarbete på Uddevalla Finmekanik AB, förkortat UFAB gällande optimering av logistikflödet för modulerna TT3 Carton och TT3 Fyll. Syftet med examensarbetet var att undersöka och kartlägga företagets interna material- och informationsflöde gällande TT3 Carton och TT3 Fyll. Utifrån kartläggningen ska författarna till studien även presentera förbättringsförslag som kan implementeras av verksamheten för att optimera flödena. Målet var att identifiera grundorsakerna som bidrog till den varierande genomloppstiden för monteringen av modulerna. För att avgränsa studien har inga ekonomiska kalkyler genomförts för nuvarande och framtida tillstånd. För att undersöka och kartlägga material- och informationsflödet gällande modulerna genomfördes huvudsakligen observationer och intervjuer med personal inom avdelningarna montering, kittning, godsmottagning, inköp och beredning.

Utifrån datainsamlingen identifierades ett flertal brister som sedan analyserades vilket resulterade i att författarna kom fram till två huvudproblem som bidrog negativt till den varierande genomloppstiden i monteringen. Problemen som identifierades var ett tryckande system samt arbetssättet vid avdelningen godsmottagningen. Brister som hade en relation till de två problem var bland annat fel i lagersaldo, strukturen i lagret och onödigt arbete som i sin tur resulterade i materialbrist hos monteringen. Författarna till studien kom fram till att implementering av ett dragande system i form av kanban skulle optimera flödena och reducera materialbristen. Vid utformandet av förbättringsförslaget identifierades tre frågeställningar vilka ansågs vara betydelsefulla för att före-taget ska lyckas med implementeringen. Frågeställningarna var hur kanban-systemet ska vara utformat, vad krävs av UFAB för att det dragande systemet kanban ska kunna implementeras samt hur börjar verksamheten med implementeringen. Utifrån frågeställningarna presenterar författarna ett tänkbart arbetssätt med elektronisk kanban samt vilka fördelar som uppstår. Det som huvudsakligen belyses i det tänkta arbetssättet är problemen som åtgärdas med implementering av kanban. Det föreslagna arbetssättet kommer att minimera materialbristen som uppstår i monteringen idag vilket i sin tur resulterar i utjämnade genomloppstider för monteringen.

Abstract [en]

During the spring of 2015 a project was executed at Uddevalla Finmekanik AB, abbreviated UFAB. The mission was to optimize the logistics for two modules. The purpose of the study was to examine and map the company's internal material- and information flow for the modules TT3 Fill and TT3 Carton. The target was to identify causes to the varying throughput at the mounting stage. The writers of the study should present solutions for the problem to optimize the flow. For examine and mapping the material- and information flow for the modules, observations and interviews were performed with the staff in mounting, picking, goods receipt, purchase and preparation.

By the data collection several flaws was identified. Analyze showed that the push flow and operations in goods receipt was two main areas that caused varied throughput time in mounting. Wrong inventory, no structure in stock and unnecessary work was some of the flaws caused by the operations in goods receipt and the push flow. The writers of the study proposed a solution that would mean implementing a pull flow with kanban. To describe the solution the writers worked with three questions at issue, how should the Kanban system be formed, what does the production require before implementing kanban and how should UFAB begin implementing kanban? By the questions of issue the writers of the study presented possible working and the advantages kanban brings to UFAB. The study is mainly describing which flaws that are fixed by implementing Kanban. The proposed solution will minimize the material shortage that is occurred by the montage which in turn results in even out the through put time in mounting.

Place, publisher, year, edition, pages
2015. , 45 p.
Keyword [en]
Logistics, material flow, flow of information, electronic kanban, inventory management, Just-In-Time, lean production
Keyword [sv]
Logistik, materialflöde, lageroptimering, informationsflöde, elektronisk kanban, Just-In-Time, Lean Production.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hv:diva-8129Local ID: EXM503OAI: oai:DiVA.org:hv-8129DiVA: diva2:854040
Subject / course
Mechanical engineering
Educational program
Industriell ekonomi
Supervisors
Examiners
Available from: 2015-09-17 Created: 2015-09-15 Last updated: 2015-09-17Bibliographically approved

Open Access in DiVA

No full text

By organisation
Division of Mechanical Engineering and Natural Sciences
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

Total: 292 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf