Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Processutveckling av förslagsverksamheten vid GKN Aerospace Sweden
University West, Department of Engineering Science, Division of Mechanical Engineering and Natural Sciences.
University West, Department of Engineering Science, Division of Mechanical Engineering and Natural Sciences.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Företagsvärlden omfattas av hård konkurrens som kräver en ständig utveckling av produkter, personal och verksamheten. Utvecklingen sker på bekostnad av hårda krav i arbetsbeskrivningar där ständigt förbättringsarbete ingår i arbetsrollen hos individerna. För att kunna sammanlänka ständiga förbättringar med verksamhetens välmående behövs ett strukturerat förbättringsarbete i form av en väl fungerande förslagsverksamhet. Förslagsverksamhetens syfte är att utnyttja erfarenheter och kunskaper från alla medarbetare genom att stimulera individernas kompetens och idégenerering för att sedan bidra med innovativa och konkurrensmässiga förbättringsförslag. Personal är en resurs som omfattar säregna kunskaper som inget annat företag kan kopiera, därför bör den användas till högsta grad.

Syftet med examensarbetet är att kartlägga och ange förbättringsåtgärder för förslagsverksamhetsprocessen vid GKN Aerospace Sweden AB i Trollhättan. Arbetet bestod av en inledande litteraturstudie som innehöll indirekta och direkta faktorer som påverkar förbättringsarbetet med en koppling till förslagsverksamheters funktioner. För att konkretisera den teoretiska referensramen om verktygens innebörd till förbättringsarbetet utfördes en teoretisk samt en praktisk benchmarking. Företagets nuvarande förslagsverksamhet kartlades och analyserades för att sedan bygga en grund för kommande förbättringsförslag.GKN Aerospace Sweden är en del av GKN-koncernen som är verksam i fler än 30 länder runt om i världen och har ca 50 000 anställda. Företaget tillverkar komponenter till flyg- och raketmotorer samt utför service och underhåll. I dagsläget arbetar GKN Aerospace med en förslagsverksamhet som är beroende helt av ett internt IT-system och har en medelledtid på 43 veckor till beslut om belöning och åtgärd. Belöningar för förslag som inkommer är ekonomiska och beräknas fram genom en specifik belöningsformel. Hela förslagsverksamhetsprocessen är omfattande och i den ingår flertalet loopar för behandling av förslag.

Examensarbetet resulterade i förbättringsförslag utifrån studier och nulägesanalys men skiljs åt från det förväntade målet att förbättra och utveckla nuvarande system. Problemet som uppkom var att nuvarande system inte stödjer verksamhetens förväntningar på förslagsverksamheten. Det resulterade i att ett helt nytt system med tillhörande rutiner och belöningsriktlinjer togs fram för att skapa incitament och högre motivation för inlämnandet av förbättringsförslag. Förbättringsförslagen mynnade ut i: avsatt tid, förbättringsarbete i grupp, uppstartsmöte, ny process, underlag för utveckling av nytt IT-system, ekonomisk och symbolisk belöning.

Abstract [en]

The business world is constantly subject to intense competition that requires continuous development of products, personnel and operations within the company. The development towards a better state comes at the expense of strict requirements in job descriptions where continuous improvement is part of the working role of individuals. In order to link the continuous improvement of the business well-being, there is a need of structured work for improvement in ways of a well-functioning suggestion scheme. Suggestion schemes main purpose is to utilize the experience and knowledge of all employees by encouraging individuals' skills and creativity, which will contribute with innovative and competitive suggestions. Personnel is a resource that covers particular knowledge that no other company can copy; therefore it should be utilized to the maximum extent possible.

The aim of the project is to identify and specify improvement measures for the suggestion scheme at GKN Aerospace Sweden AB in Trollhättan. The work consisted of an initial literature review, which included direct and indirect factors effecting the continuous improvement with linkage to the proposed suggestion scheme. In order to concretize the theoretical framework of the tools main purpose for the continuous improvement, a theoretical and a practical benchmarking was utilized. The company's current suggestion scheme was mapped and analyzed, and a foundation for future improvements was established.GKN Aerospace Sweden is part of the GKN Group, which operates in more than 30 countries around the world and employs about 50 000 individuals. The company manufactures components for aircraft and rocket engines, as well as service and maintenance. In the current situation GKN Aerospace manages a suggestion scheme that depends entirely on an internal IT system and has an average lead time of 43 weeks until a decision is made. The reward system for received suggestions is an economic reimbursement calculated through a complex formula. The entire suggestion scheme process is extensive and includes several loops for conducting the evaluation of suggestions.

The thesis resulted in improvement propositions based on studies and situation analysis, but differs from the expected target to improve and develop the current system. The problem that arose was that the current system does not support the company's expectations for the suggestion scheme process. It resulted in a completely new system with associated procedures and reward guidelines were developed to create incentives and higher motivation for the submission of suggestions for improvement. The improvement propositions resulted in: dedicated time for improvements, group-based activities for continuous improvements, start-up meetings, new process, basis for the development of a new IT system, economic and symbolic rewards.Date: 2015-

Place, publisher, year, edition, pages
2015. , p. 70
Keywords [en]
Improvement Work, Quality, Suggestion Scheme, Process Development, Reward Guidelines, Rational Unified Process, Kaizen, IT System
Keywords [sv]
Förbättringsarbete, Kvalitet, Förslagsverksamhet, Processutveckling, Benchmarking, Rutiner, Belöningsriktlinjer, Rational Unified Process, Kaizen, IT-system
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:hv:diva-7811Local ID: EXM503OAI: oai:DiVA.org:hv-7811DiVA, id: diva2:843273
Subject / course
Mechanical engineering
Educational program
Industriell ekonomi
Supervisors
Examiners
Available from: 2015-08-17 Created: 2015-07-28 Last updated: 2021-04-29Bibliographically approved

Open Access in DiVA

fulltext(1107 kB)917 downloads
File information
File name FULLTEXT01.pdfFile size 1107 kBChecksum SHA-512
e226547cd8b33bcc2f831b129a9c97924282c0f9cae0210c4c15d13db75ce0c5f5292b3c3d5ec7d9283a1d26c2e83811b0d09196dbc30f4167c80fd450e21a84
Type fulltextMimetype application/pdf

By organisation
Division of Mechanical Engineering and Natural Sciences
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 917 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 2442 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf