Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förutsättningar för mikroproduktion med vindkraft för Byggnad 73 på Innovatum
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2014 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Prerequisites for micro production with wind power for Building 73 at Innovatum (English)
Abstract [sv]

I dagens samhälle eftersöks miljövänligt producerad elektricitet i allt högre grad. Denna rapport avhandlar vilka förutsättningar som finns för att producera energi ifrån småskaliga vindkraftverk i anslutning till Byggnad 73 i Trollhättan som ligger placerad i urban miljö.

I rapporten har en sammanställan gjorts av hur ett vindkraftverk fungerar samt vilka lagar, regler och rekommendationer som skall följas vid uppförande av småskaliga vindkraftverk i urban miljö. En marknadsundersökning av svenska marknaden har utförts. Från marknadsundersökningen har underlag hämtats till två anläggningsförslag lämpliga för Byggnad 73.

Under arbetet framkom att det finns olika definitioner av småskaliga vindkraftverk. Det finns även en rad av olika lagar och regler som hänsyn skall tas till vid uppförandet av ett vindkraftverk. Det konstaterades att det är viktigt att undersöka förutsättningarna för placering av vindkraftverk så som tillexempel hinder och årsmedelvind. Byggnadens förutsättningar undersöktes och kontakt med Kent Andersson som är lokal- och utrustningsansvarig på Byggnad 73 togs, och då framkom det att dess säkringsstorlek var för stor för inkoppling av mikroproduktion samt att byggnadens konstruktion inte kan hantera vikten av ett vindkraftverk. Dessa aspekter har gruppen fått bortse ifrån när två anläggningsförslagen togs fram. Varav det ena anläggningsförslaget är monterat på byggnadens tak och det andra på marken bredvid byggnaden.

Två vindkraftverk valdes ut Winden 30 och Villaverket Maglev 10kW. Winden 30 är ett 30 kW vindkraftverk som monteras på marken och som är tillverkat av Winden Sweden AB. Det vindkraftverket som skall vara takmonterat blev Villaverket Maglev 10kW som är tillverkat av Nordh Energy och har en effekt på 10 kW.

Trots att tidigare nämnda aspekter bortsågs ifrån framkom att montering av vindkraftverk i urban miljö inte är lämpligt på grund av flera olika orsaker. Men småskalig vindkraft kan vara lämplig i en lantlig miljö då flera av dessa orsaker vanligtvis inte existerar i sådan miljö.

I denna rapport har ekonomiska aspekter för att uppföra ett vindkraftverk helt bortsetts ifrån.

Abstract [en]

In today's society environmental friendly electricity is sought after. This thesis will discuss the prerequisites to produce electricity from micro production wind turbines adjacent to Building 73 Trollhättan, situated in an urban environment.

This thesis compiles information about wind turbine technology and the laws, rules and recommendations to be followed while constructing a wind turbine in urban environments. A market research of the Swedish micro wind turbine market has been concluded. From the market research results two suitable wind turbine proposals has been presented. During the process it was revealed that there are different definitions of micro production. There is also many different laws, rules and recommendations that you have to consider while constructing a wind turbine. It was established that it is important to examine the prerequisites of the environment in the area where you plan to place the wind turbine for example you have to consider obstacles and average annual wind speed.

The prerequisites of the building were established and contact with Kent Andersson building-and equipment manager was made. We discovered that the electricity contract was too large for connecting of micro production and the construction of the building was too weak to support the weight of a wind turbine. Even though these aspects were disregarded we came to the conclusion that wind power in an urban environment is not appropriate for many different causes. But micro production in form of wind power is suitable in a rural environment where many of these causes do not exist.

The group has disregarded these aspects when the two wind turbine suggestions were formed. Of these two suggestions one is mounted on the roof and the other on the ground besides the building. The two wind turbines that came to be chosen were Winden 30 and Villaverket Maglev 10 kW. Winden 30 is a wind turbine with an effect of 30 kW that should be placed on the ground beside the building and is made in Sweden by Winden Sweden AB. Villaverket Maglev 10 kW which is made by Nordh Energy and is supposed to be placed on the roof of the building.

In this thesis the economic aspects of wind turbine construction has been disregarded.

Place, publisher, year, edition, pages
2014. , p. 33
Keywords [en]
Wind power, Micro production, Innovatum
Keywords [sv]
Mikroproduktion, vindkraft, Innovatum
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-7722Local ID: EXH300OAI: oai:DiVA.org:hv-7722DiVA, id: diva2:819905
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2015-06-11 Created: 2015-06-11 Last updated: 2015-12-22Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 431 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf