Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
En förstudie avseende omfördelning av laster vid företaget Nolato Cerbo AB
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Preliminary study of the redistribution of loads at Nolato Cerbo AB (English)
Abstract [sv]

Detta examensarbete är en förstudie utfört på företaget Nolato Cerbo AB som är ett företag i Trollhättan som producerar plastförpackningar till bl.a. läkemedelsindustrin. Arbetet utfördes på uppdrag av konsultföretaget ÅF Industry AB.

Företaget har en elanläggning där några transformatorer är hårt belastade, medan andra har mycket reservkapacitet. Syftet med detta arbete är att undersöka vilka laster som är lämpliga att omfördela till ett nytt ställverk och att ge förslag om vilken transformator som i så fall skall mata det nya ställverket för att få en stabilare elanläggning.

Resultatet visar främst vilka laster som skall ingå i det nya ställverket och hur det skall dimensioneras som även säkerställer framtida utbyggnader. Ett förslag har framförts om vilken transformator som är lämplig att använda som matning för det nya ställverket, då transformatorn uppfyller kraven om tillgängligt kablage och tillräckligt reservkapacitet.

Abstract [en]

This thesis is a preliminary study conducted at the company Nolato Cerbo AB, a company in Trollhättan that produces plastic packaging e.g. for the pharmaceutical industry. The work was commissioned by the consulting firm ÅF Industry AB.

The company has an electrical installation where some transformers are heavily loaded, while others have much spare capacity. The aim with this work is to investigate what loads are appropriate to reallocate to a new switchgear and to give suggestions on what transformer should feed the new switchgear to get a better utilization of the electrical installation.

The result shows mainly which loads should be included in the new switchgear and how this should be designed with a capacity that also ensures future expansions. A proposal has been made on a suitable transformer feeding the new switchgear, as this transformer meets the requirements for accessible cables and sufficient reserve capacity.

Place, publisher, year, edition, pages
2015. , p. 18
Keywords [en]
Low-voltage, transformer, operation rooms, documentation and feasibility studies
Keywords [sv]
Lågspänning, transformator, driftrum, dokumentation och förstudier
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-7385Local ID: EXH300OAI: oai:DiVA.org:hv-7385DiVA, id: diva2:789183
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2015-02-23 Created: 2015-02-18 Last updated: 2015-02-23Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 227 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf