Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Beredning av låg- och högspänningsnät i Estenberga i Gullspång kommun
University West, Department of Engineering Science, Division of Computer and Electrical Engineering.
University West, Department of Engineering Science, Division of Computer and Electrical Engineering.
2014 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Preparation of low and high power lines in Estenberga in Gullspång (English)
Abstract [sv]

Detta examensarbete handlar om beredningsarbete i samhället Estenberga som ligger i Gullspångs kommun. På grund av dålig spänningskvalitet har nätägaren Fortum bestämt att ett nytt elnät måste upprättas. Beredning innebär att sköta kontakter med myndigheter och markägare för att ha alla tillstånd, avtal och bygglov klart innan entreprenören utför fältarbetet. Beredaren måste åka till det berörda området för att kontrollera terrängen och bestämma vart det är lämpligast att kablarna skall förläggas samt vart nätstationer och kabelskåp ska stå för att göra så litet avtryck i omgivningen som möjligt. Beredaren gör även en P2 kalkyl som beräknar vad hela projektet kommer att kosta för nätägaren. Detta projekt omfattar placering av två nätstationer, fem kabelskåp och totalt kommer 4,6 km kabel förläggas i mark. Tjugotre abonnenter har kontaktats för att ge information om förändringen som kommer att ske samt för att få markupplåtelseavtal och värderingsprotokoll påskrivna

Abstract [en]

This thesis is about the preparation work in the community EstenBerga, which is located outside the town of Gullspång. Due to poor power quality has the network owner Fortum decided that a new electricity network must be established. A preparation means to manage contacts with agencies and landowners to have all permits and agreements prepared before the contractor performs work in the field. The preparer must go to the place and check the terrain and decide where it is suitable to place the cables and where the substations and cable cabinets should be to do as little footprint in the environment as possible. The preparer also does a P2 spreadsheet that calculates what the entire project will cost the network owner. This project includes the placement of two substations, five cable cabinets and a total of 4.6 km cable placed in the ground. Twenty-three subscribers were contacted to inform them of the change that will happen and to get land lease agreement and the valuation protocol inscribed

Place, publisher, year, edition, pages
2014. , p. 12
Keywords [en]
Preparation, Maps, Planning
Keywords [sv]
Beredning, Projektering, P2 kalkyl
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-6870Local ID: EXH300OAI: oai:DiVA.org:hv-6870DiVA, id: diva2:756878
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2014-10-20 Created: 2014-10-20 Last updated: 2015-12-22Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Computer and Electrical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 750 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf