Planned maintenance
A system upgrade is planned for 24/9-2024, at 12:00-14:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Potential improvements for launches at Autoliv Sweden AB, focusing on the purchasing process
University West, Department of Engineering Science.
2013 (English)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

During the summer 2012 a bachelor’s thesis was performed at Autoliv Sweden AB inVårgårda regarding potential improvements on launches, with focus on the purchasingprocess. The activities that were needed to be able to reach the main goal, proposals ofpotential improvements, were divided into three interim goals. The interim goals can beseen as activities along the way containing necessary information that was needed to beable to come up with potential improvements.

The approach for the thesis was to first do a literature review on value stream mapping, how development projects at Autoliv Sweden AB are performed and on launches in theautomotive industry based on scientific articles. After the literature review a case study wasmade, using value stream mapping as a tool, on one development project at AutolivSweden AB for investigation of the launch. The result of the case study was presented intwo maps over the administrative stream for the components in the development project;one according to project time plan and one according to how the activities in the launchactual were performed.

Based on the literature and the maps from the case study, three potential improvements, that would be relatively easy and inexpensive to implement, were found; (1) Involve thesupplier more and at an earlier stage in the development project, (2) involve the Logisticsdepartment more and (3) implement control level definition on the development projectsas well, not just the parts.

The conclusion for this thesis was that if Autoliv Sweden AB decides to implement allproposed improvements both money and time will be saved.

Place, publisher, year, edition, pages
2013. , p. 40
Keywords [en]
Project Launch, Component Launch, Development Projects, Purchasing, Autoliv Sweden AB
National Category
Other Engineering and Technologies not elsewhere specified
Identifiers
URN: urn:nbn:se:hv:diva-5228OAI: oai:DiVA.org:hv-5228DiVA, id: diva2:614008
Subject / course
Industrial organization and economics
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-04-29 Created: 2013-04-03 Last updated: 2013-04-29Bibliographically approved

Open Access in DiVA

fulltext(1308 kB)1456 downloads
File information
File name FULLTEXT01.pdfFile size 1308 kBChecksum SHA-512
859f731719dc0c8781f63c7cf4934f6486822f40ab6e6043e914cbc29cf67a1d81ff290a09934b35ba25dc92da121ad2bdd2c5b5988ef6e93c69565a1304e5b3
Type fulltextMimetype application/pdf

By organisation
Department of Engineering Science
Other Engineering and Technologies not elsewhere specified

Search outside of DiVA

GoogleGoogle Scholar
Total: 1464 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 448 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf