Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Etablering av vindparker på arrenderad mark: En studie av markåtkomst för vägar
University West, Department of Engineering Science, Division of Natural Sciences and Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Natural Sciences and Electrical and Surveying Engineering.
2012 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Vindkraftsutbyggnaden i Sverige har ökat i hög takt de senaste åren. Mellan år 2008 – 2011 ökade produktionen av el från vindkraft med 209 %.  Under år 2011 motsvarade detta en energiproduktion på 6,1 TWh, vilket tyder på att Sverige ligger i god fas för att uppnå det av riksdagen antagna utbyggnadsmålet att produktionen år 2020 ska uppgå till 30 TWh.

Vid etablering av vindparker är en väl genomförd projektering av stor vikt för att uppnå lönsamhet och minimera riskerna i projektet. De olika faserna i projekteringen innefattar en viktig förprojektering där förutsättningarna för etableringen utreds, projektering med samråd och upprättande av en miljökonsekvensbeskrivning, ansökan om de tillstånd och lov som krävs, upphandling av verk och entreprenadarbeten samt den avslutande byggnationen där vägar anläggs, verk uppförs och starkströmsledningar ansluts till elnätet.  I arbetet ges en generell modell för hur man kan gå tillväga och vilka faktorer som ska beaktas.

Syftet med arbetet är att utreda hur rätt till väg kan säkerställas i samband med vindkraftsetablering på arrenderad mark. Frågan är viktig i sammanhanget och behöver lösas för att kunna uppföra, underhålla och nedmontera verken.

Då arrendeupplåtelse föreligger ges arrendatorn i avtalet vanligtvis rätt att inom arrendeområdet nyttja och anlägga de vägar som behövs för etableringen. Utom arrendeområdet är det inte alltid lika självklart hur rätten till väg ska säkerställas. Vanligtvis behöver breddning och förstärkning ske av de befintliga vägar som ska nyttjas samt även nya vägsträckningar anläggas. Beroende på vilka förutsättningar och behov som föreligger i det enskilda fallet kan nyttjanderätt, gemensamhetsanläggning eller i vissa fall officialrättigheter bli aktuella.

Den faktor som är av störst betydelse för vilket alternativ som kan användas är om vindkraftsanläggningen är uppförd eller inte. Eftersom vindkraftbolaget i arrendefallet inte äger någon fastighet som en rättighet kan knytas till kan endast nyttjanderätt användas då anläggningen inte är uppförd. Om berörda fastighetsägare motsätter sig åtgärden finns även möjlighet till att tvångsvis expropriera nyttjanderätt. När anläggningen är uppförd är även alternativen att inträda i en gemensamhetsanläggning eller upplåta ett officialservitut enligt anläggningslagen möjliga. Dessa kan tillämpas både när fastighetsägarna är positiva till åtgärden men även i vissa fall utan deras medgivande.

I arbetet utreds de olika alternativens innebörd och tillämplighet för att i slutändan analyseras och sammanfattas.

Abstract [en]

The expansion of wind power in Sweden has increased at a rapid pace in the recent years. Between the years 2008 – 2011, the productions of electricity from wind power were increased by 209%. During 2011, this corresponded to an energy production of 6,1 TWh, which suggests that Sweden is in a good phase to achieve the environmental objectives, adopted by the Parliament. The objectives purpose is that the production in 2020 will amount to 30 TWh.

When a wind farm is to be establish a well-executed project is of great importance for achieving profitability and minimize the risks in the project.  The different phases of the project includes an important pre-planning where the conditions for establishment are investigated, the planning with consultation and preparation of an environmental assessment, the application of needed authorizations and permissions, procurement of works and construction works and the final construction where roads and wind turbines are constructed and power lines connects to the mains. This thesis provides a general model for how to proceed and what factors should be considered in the establishment of wind farms.

The purpose of this thesis is to investigate how the right of roads can be ensured in the case when the wind park shall be established on leased land. The question is important and needs to be solved in order to construct, maintain and decommission the wind turbines.

When lease tenure is hold, the lessee in the contract usually gives the right to use and construct roads within the leased area. Outside the leased area it’s not always as obvious how the right of roads should be ensured. Usually needs widening and strengthening of the existing roads that will be used as well as new roads are to be constructed.

Depending on the circumstances and requirements of the particular case, tenancies, joint facility, easements or expropriation can be present in order to secure the right of roads. The factor of most importance for when the options can be used is if the wind park is built

or not. Since the wind power company in a lease case doesn’t own any property only tenancies can be used when the wind park isn’t built. If the property owners oppose the measure it’s also possible to forcibly expropriate tenancies. When the wind park is built it’s also possibly to enter into a joint facility or grant an easement. These can be applied both when the property owners are in favor of the action, but also in some cases without their consent.

This thesis investigates the various options, their meaning and applicability to finally be analyzed and summarized. 

Place, publisher, year, edition, pages
2012. , p. 41
Keywords [sv]
Vindkraft, vindpark, arrende, vägar, nyttjanderätt, servitut, gemensamhetsanläggning, expropriation.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hv:diva-4937OAI: oai:DiVA.org:hv-4937DiVA, id: diva2:580585
Subject / course
Land surveying
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-12-27 Created: 2012-12-23 Last updated: 2012-12-27Bibliographically approved

Open Access in DiVA

fulltext(978 kB)1058 downloads
File information
File name FULLTEXT01.pdfFile size 978 kBChecksum SHA-512
5bd59e857f76046d32e819ee34f286e7ca2c19fd72dbd86364cd5fdda62317317ebcfe97dfb0a92016c2218af887ff8ddda40d3b24e0c6b31f88bd9f0fced57d
Type fulltextMimetype application/pdf

By organisation
Division of Natural Sciences and Electrical and Surveying Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 1059 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 817 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf