Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Fallstudie i Järbo: En utredning av förutsättningarna för återstart av ett nedlagt småskaligt vattenkraftverk
University West, Department of Engineering Science, Division of Electrical and Automation Engineering.
2009 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Case study in Järbo : An investigation of the prerequisites for restart of a discontinued, smallscale hydropower plant (English)
Abstract [sv]

Utsikterna att kunna genomföra en återstart av de två små vattenkraftverk som behandlas i denna rapport år goda. Förutsättningarna är gynnsamma i så måtto att planerna för återstarten ligger väl i linje med praxis som etablerats genom avgöranden i de högre rättsliga instanserna gällande liknande fall. Ägaren planerar att driva verksamheten i stort sett så som den ursprungligen bedrevs, vilket visat sig betydelsefullt för att få återupptag av nedlagd vattenkraftverksamhet godkänt Dessa kraftverk är små, väldigt små. Detta betyder att investeringskostnaderna måste minimeras om det skall finns någon chans att uppnå en acceptabel återbetalningstid för investeringen. Några kostnader kan inte påverkas alls, till exempel anslutningen till elnätet. Vissa, såsom de för nya tuber, intagsgaller, samt kabel och utrustning till kraftverken, kan påverkas i någon mån genom att omsorgsfullt välja leverantörerna av utrustningen, samt välja de mest kostnadseffektiva (ofta liktydigt med de enklaste men ändå fungerande) lösningarna. Några få komponenter, såsom generatorn, kan gå att få tag på som begagnade, vilket hjälper till att hålla nere kostnaderna. Slutligen bör inte de pengar som finns att spara på att göra så mycket som möjligt av arbetet själv underskattas.

Abstract [en]

The prospects of achieving a restart of the two small hydropower plants studied in this report are good. The basic conditions are favourable in the sense that the plans for a restart are well in line with accepted procedures such as established by decisions in the highest courts regarding similar cases. The owner plans to run the operation in essentially the same way it was originally run, a circumstance which has proven to be important when seeking to get restart of discontinued hydropower activities approved. These power plants are small, very small. This means that investment costs has to be minimized if there is to be any chance of achieving an acceptable pay-off time for the investment. Some can't be affected at all, such as the cost for getting connected to the power network. Some, such as those of new tubes, intake bars and electrical wiring and equipment for the plants, can be affected to some extent by carefully choosing the suppliers of the equipment and choosing the most cost-efficient (in most cases synonymous with the simplest but yet functional) solutions. A few components, such as the generator, can possibly be obtained as used equipment, which helps keeping the costs down. Lastly, the potential of saving money by doing as much as possible of the work yourself should not be underestimated.

Place, publisher, year, edition, pages
2009. , p. 26
Keywords [en]
Prerequisites, precipitation change, investment costs, permission issues, power network
Keywords [sv]
Förutsättningar, nederbördsförändring, investeringskostnader, tillståndsfrågor
National Category
Other Electrical Engineering, Electronic Engineering, Information Engineering Other Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-1511OAI: oai:DiVA.org:hv-1511DiVA, id: diva2:216509
Subject / course
Electrotechnology
Educational program
Elkraft
Presentation
(English)
Uppsok
Technology
Supervisors
Examiners
Available from: 2009-05-09 Created: 2009-05-09 Last updated: 2015-12-22Bibliographically approved

Open Access in DiVA

fulltext(898 kB)1601 downloads
File information
File name FULLTEXT01.pdfFile size 898 kBChecksum SHA-512
5de0b56f633f4dd60df146748acd6cd14009875a512340d58587b9b4e684fbdbb3929477394bb5b53ad2182d4f6af707b5f32bc4fb88a1e1424fca44bc3b7a42
Type fulltextMimetype application/pdf

By organisation
Division of Electrical and Automation Engineering
Other Electrical Engineering, Electronic Engineering, Information EngineeringOther Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1601 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 654 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf