Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Åtgärder för att minimera kommunikationsstörningar vid avläsning av elmätare via elnätet
University West, Department of Engineering Science.
2009 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Measures for minimising communication disturbances when reading electricity meters via the power grid (English)
Abstract [sv]

Detta examensarbete tar upp frågan om kommunikationsproblem mellan de komponenter som ingår i ADDAX systemet, till största del de problem som uppstår mellan router och mätare. ADDAX systemet är uppbyggt på ett hierarkiskt vis med ADDAX server högst upp och mätaren längs ned. Systemet kommunicerar via PLC ”power line comunication”. Uppgiften har varit att kartlägga hur mätsystemet fungerar, vilka geografiska problemområden som finns med avseende på kommunikations problem, lokalisering av störkällor, åtgärdning av dessa störkällor och framtagande av ett flödesschema som skall kunna användas av montörerna vid felsökning i systemet. Arbetet inleddes med att ta fram underlag för vilka områden som påverkas av störningar i elnätskommunikationen. Detta gjordes med hjälp av programmet ”TC Meter Surv SA Edition 0.61” som arbetar mot ADDAX systemets databas för att se vilka mätare som är installerade och vilka som kommunicerar med systemet. Efter vissa problem togs två områden fram, ett på landsbygden och ett i centrala Grästorp. Vid mätning i dessa områden användes till en början två instrument, PL-monitor och HF+. HF+ visade sig vara överflödigt då samma information ges av PL-monnitor båda versioner visar på vilka störningsnivåer som finns i elnätet. HF+ är mer svårtolkat då användaren själv måste ta ställning till informationen som visas medan PL-monnitor enbart visar på den störning som stör ut kommunikationen. Då mätningarna genomförts och analyserats har det visat sig att programmet ej fungerat tillfredställande och att fel information om antal felaktiga mätare i de område som är beläget i centrala Grästorp, detta har resulterat i att en ny slutsats dragits där istället för en störning i LV nu problemet verkar ligga i MV. Kommunikations problemet på landsbygden kan troligtvis lösas med att installera filter hos de kunder vars mätare ej kommunicerar. Andra åtgärder som kan vara aktuella vid framtida kommunikationsproblem kan vara byta av kommunikations fas på mätaren, flytt av mätaren till matningsskåp, installation av repeterare eller att i samråd med kund få denna att stänga av störande utrustning vissa tider på dygnet. En slutsats som dragits av de erfarenheter som ackumulerats under projektets gång är att all mjukvara bör uppdateras och att master-routrar ersätts med en nyare version.

Abstract [en]

This report handles the issue of communication problems that appears between the components in the ADDAX system, mainly between the router and meter. The system is built around a hierarchy with the ADDAX server at the top and the meter at the bottom. The system uses the power grid as communication medium, this is called PLC “power line communication. The task has bin to se how the system works, witch geographical areas that have problems with communication, localization of source for the disturbing of the communication, attend to the disturbing and to make a flow chart that the electricians can use when they are conducting a measurement. A program called “TC Meter Surv SA Edition 0.61” was used for finding which areas that have problems with the communication. Two areas were chosen, one in the countryside and one in central Grästorp. The program firs showed that some meters where missing but when the measurements where don the program showed that all meters where missing. The reason for this problem is unknown. The problem in the central Grästorp area is not in the LV butt in the MV. The conclusion will be that al of the software must be updated and that the master routers could be replaced with a never versions before any new measurements are to be done. The power quality measurement instruments that has bin used are PL-monitor and HF+. On other conclusion that can bi don is that HF+ is superfluous because it chows the same information that PL-monitor dose but it’s harder to interpret. In the area on the countryside the solution to the communication problem can bi to install a filter. Other solutions to PLC problems can bi to switch the phase the meter uses for communication, move the meter farther from the customer, installing a repeater or in consultation with the customer get him or here to turn of the devise that disturb the communication under some ours in a 24-hour period.

Place, publisher, year, edition, pages
2009. , p. 33
Keywords [en]
ADDAX, PLC, PLC problems, electrik cuality
Keywords [sv]
ADDAX, elnätskommunikation, kommunikationsproblem, mätning av störningar, PLC
National Category
Control Engineering
Identifiers
URN: urn:nbn:se:hv:diva-1493OAI: oai:DiVA.org:hv-1493DiVA, id: diva2:216417
Presentation
(English)
Uppsok
teknik
Supervisors
Examiners
Available from: 2009-05-08 Created: 2009-05-08 Last updated: 2009-05-08Bibliographically approved

Open Access in DiVA

fulltext(755 kB)1693 downloads
File information
File name FULLTEXT01.pdfFile size 755 kBChecksum SHA-512
8a16699b1adc529faede93ff23a294f4307d6539849ae9b909f118f37320994cd65e985b0f029d134329fadfd866a7e3b243b2f0aac1889c02c0fe2e8ef2dea1
Type fulltextMimetype application/pdf

By organisation
Department of Engineering Science
Control Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1693 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 976 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf