Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förstudie inför ombyggnation av mottagningsstation M2 Edshultshall
University West, Department of Engineering Science.
2023 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
A pre-study to the reconstruction of distribution station M2 Edshultshall (English)
Abstract [sv]

Västra Orust Energitjänst (VOE) står inför ett problem, där mottagningsstationen M2 Edshultshall (40/10 kV) är i behov av förnyelse efter flertal oönskade avbrott på kort tid. Vattenfall som äger regionnätet har under en längre period tänkt förstärka förbindelsen till M2 Edshultshall, men har blivit nekade av Energimarknadsinspektionen för koncessionsrätten av en ny ledning. En ny ansökan tar tid, och västra Orusts framtida effektbehov behöver lösas snarast. I denna rapport framställs olika sätt att leverera elenergitill västra Orusts befolkning genom en ombyggnation av M2 Edshultshall till en fördelningsstation inom distributionsnätet.

På VOE:s koncessionsområde sträcker sig idag Vattenfalls radiella friledning som försörjer M2 Edshultshall genom 40 kV regionnätet. Det studeras om denna friledning kan övertas av VOE som en redundant ledning till M2 Edshultshall via distributionsnätet på 10 kVspänningsnivå tillsammans med en ny kabelförbindelse. Rapporten tar upp förslag på nykabelmatning, med spänningsfall, förluster och kortslutningsberäkningar. Även driftlägen för normaldrift och reservdrift, med enlinjeschema över nya stationen M2 Edshultshall berörs i rapporten.

Rapporten tar även upp en del teori inom distributionsnät för att förbereda läsaren för kommande resultatdelar.

Diskussionskapitlet tar upp författarens personliga tankar kring om lösningen är rimlig sett från de dimensioneringsaspekter som tagits upp, där spänningsfall vid höglastperioder och reservmatningsmöjligheter anses bli problematiska. Rekommenderade slutsatser till projektet är att efter övertaget av den gamla 40 kV friledningen utföra ett linbyte till 234 mm2 FeAl eller 241 mm2 AlMgSi. Ett nytt kabelförband förläggs, med rekommenderad area på 630 mm2.

Projektets totala kostnad uppskattas till 8,4 miljoner kronor.

Abstract [en]

Västra Orusts Energitjänst (VOE) is facing a problem, where the substation M2 Edshultshall needs to be reconstructed after several unwanted power outages in a short period of time. Vattenfall, which owns the feeding line to M2 Edshultshall, has had plans for a new connection for a long time, but they’ve been denied the rights by Energimarknadsinspektionen. A new application takes time, and west Orust’s power delivery needs to be resolved soon. This study provides ways to deliver power to west Orust through the reconstruction of M2 Edshultshall to a 10 kV substation.

Inside VOE: s concession area, Vattenfall has a radial 40 kV overhead line that provides M2 Edshultshall with power. A study has been made if the overhead line could be taken over by VOE and be used as a redundant line together with a new cable connection trough the 10 kV distribution grid. This study makes suggestions of a new cable, with acceptable voltage drops, losses and short circuit currents. Also operating modes for normal use and reserveoperation, with a single line diagram of new M2 Edshultshall.

The study also prepares the reader with some electrical theory.

The author’s personal thoughts regarding the project and its solutions are discussed, where voltage drops during high load and reserve operations can be problematic. The conclusion of this study is to reline the old 40 kV overhead line to a 234 mm2 FeAl or 241 mm2 AlMgSi. Together with a new cable connection with an area of 630 mm2.

This project will cost around 8,4 million SEK.

Place, publisher, year, edition, pages
2023. , p. 45
Keywords [sv]
Mottagningsstation, ombyggnation
National Category
Other Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-19723Local ID: EXE512OAI: oai:DiVA.org:hv-19723DiVA, id: diva2:1740473
Subject / course
Electrotechnology
Educational program
Elektroingenjör - Elkraft
Supervisors
Examiners
Available from: 2023-04-12 Created: 2023-03-01 Last updated: 2023-04-19Bibliographically approved

Open Access in DiVA

fulltext(1623 kB)95 downloads
File information
File name FULLTEXT01.pdfFile size 1623 kBChecksum SHA-512
d2f912784b332c58ae92ca0507f85389dd1db444c47c5f56f86451d8f12cfd4b25bc68283b147803131a38cfb2d720ecfb1f4d2008bff00a335e548c4ce4c674
Type fulltextMimetype application/pdf

By organisation
Department of Engineering Science
Other Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 95 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 98 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf