Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Uppdatering av selektivplan för SSAB Oxelösund
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2022 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Improvement of the selectivity protection plan regarding SSAB Oxelösund (English)
Abstract [sv]

Detta arbete visar grunderna och resultatet till vad en selektivplan syftar till att uppnå. Metoderna i rapporten beskriver tillvägagångsättet främst vid radiell nätstruktur. I maskade nät krävs att hänsyn tas till andra förutsättningar vilket inte beskrivs i denna rapport. 

Säkerheten att få felbortkoppling är alltid det som kommer först men ett väl inställt skydd är inte en garanti för felbortkoppling då även skyddsutrustning kan gå sönder. Därför ska varje punkt i nätet skyddas av minst två skydd som har helt oberoende förmågor att bortkoppla ett fel och säkerställa att kravet på felbortkoppling uppfylls. Kan detta dessutom göras selektivt för att minska konsekvenserna på omkringliggande elnät är det att eftersträva men kravet på selektivitet kommer alltid i andra hand. Balansgången mellan kriterierna för säkerhet och samtidigt eftersträva selektivitet är vad selektivplansarbetet går ut på. 

Arbetet i denna rapport visar på vilka sätt ett selektivplansarbete appliceras på komponenterna i SSAB:s elnät och vad det kommer göra för skillnad i slutändan. Elnätet som SSAB ansvarar för uppfyller kraven för bortkoppling av fel och inom 10,5kV-nätet finns förutsättningar för selektiv bortkoppling. Däremot framgår att metoden som i nuläget används bygger på blockeringar av ovanliggande snabba steg. Detta leder till att ifall de ordinarie skydden fallerar eller inte kan genomföra bortkopplingen så kommer reservfunktionerna utgöras av lågströmssteg med högt ställda felbortkopplingstider. Konsekvensen av långvariga felströmmar blir att elnätet ut till felpunkten kommer påfrestas av den avsevärt stora energi som passerar. Även kan resterande delar bli drabbade av ostabil nätspänning. 

Ett förlag lämnas i rapporten att utreda alternativ till denna metod, vilket skulle vara att introducera differentialskydd i en större utsträckning. Ett behov finns även att koordinera och utreda inställningarna till samtliga lågspänningsbrytare inom SSAB:s elnät då dessa inte ska innefattas i denna utredning. 

Abstract [en]

This study presents the result and purpose of a selective protection plan. The methods described applies mainly to radial grids. Meshed grids require that other conditions are taken in perspective which not is further explained in this report. 

The number one priority is always safety because even a well configurated and planed protection can fail. This is the reason why every part of the grid must be supervised by at least two, by each other, independent protections with the means to trip the circuit-breaker and ensure that the safety requirements are fulfilled. If the trip can be made in coordination to reduce the consequences of a blackout, this is always prefarable, as long as the condition for safety is not affected. The work behind a selective protection plan is to find a balance between these criteria. 

The report aims to show in what ways the selectivity analysis is applied to the electrical grid components and how this affects the grid in case of a fault. The safety requirements for disconnecting an electrical fault are met, and there are partially conditions for coordination between the protections in the electrical grid of SSAB. The method used within the electrical system is based on blocking the high stage over current function in the protection above the primary protection as seen from the fault location. The problem with this method is in case the fallback protection is based on the low stage over current function, which is often delayed substantially as compared to the high current function. The consequences of prolonged fault-currents in the system affect all the electrical components from the feeder to the fault. This will also have an impact on the voltage stability which can further affect the rest of the electrical grid within SSAB.

A suggestion is presented to investigate an alternative method to block the high current stages. One alternative could be to introduce more differential protections. There is also a need to investigate the over current parameters for the low voltage circuit-breakers,which are not included in this study.

Place, publisher, year, edition, pages
2022. , p. 34
Keywords [sv]
Elnät, nätstruktur
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-18150Local ID: EXE511OAI: oai:DiVA.org:hv-18150DiVA, id: diva2:1637200
Subject / course
Electrotechnology
Educational program
Elektroingenjör - Elkraft
Supervisors
Examiners
Available from: 2022-02-18 Created: 2022-02-12 Last updated: 2022-02-18Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 150 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf