Övervakning av kapacitetsbegränsningar i kraftsystemet
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2021 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Monitoring of capacity constraints in the powersystem (English)
Abstract [sv]

Det här examensarbetet genomförs med Vattenfall Eldistribution som uppdragsgivare. Parter inom företaget anser att driftövervakningen idag sker aningen konservativt och traditionsbundet. Syftet med arbetet är att tydliggöra nuvarande övervakningsfilosofi och försöka hitta eventuella förbättringar och förändringar som kan införas i Vattenfall Eldistributions styrande dokument och driftövervakningssystem. Elektrisk kraftöverföring är ett effektivt och flexibelt sätt att transportera energi. Överföringsförmågan i ett elnät är dock begränsad och bestäms av de ingående komponenters kapacitetsgränser. Begränsningarna är oftast av termisk eller mekanisk natur, och ibland även en kombination av dessa. Ur ett övervakningsperspektiv kan en anläggning eller anläggningsdel i kraftsystemet bestå av flera ingående komponenter, exempelvis luftledningssektioner, kabelsektioner, frånskiljare, brytare, ström- och krafttransformatorer samt reläskydd. I rapporten framkommer det att luftledningar är den komponent som begränsar överföringsförmågan i systemet mest, följt av strömtransformatorer. Märkströmmen är den ström som sätter begränsningen för överföringskapaciteten i luftledningarna, den är baserad på kontinuerlig drift och vid bestämda förutsättningar där omgivningens förmåga att kyla är avgörande. När beräkningar av överföringsförmågan genomförs antas parametrar med sämsta tänkbara kylningsförhållandet. Bedömningen av överföringsförmågan är inte alltid enhetligt med hur larmgränserna fastslås, detta eftersom larmgränserna fastslås med försiktighet då det är en hjälpfunktion för driftoperatörerna. Larmen är ett verktyg för operatören som alltid kräver ett aktivt ställningstagande. Överlastförmågan är kopplat till åldring och haveri men även till anläggningssäkerheten. I rapporten framkommer det att apparater och kablar generellt inte överbelastas i Vattenfall Eldistributions nät medans luftledningar och transformatorer antas ha utrymme för det. Samtliga komponenter är beroende av sin omgivnings klimat men ändå tas inte hänsyn till detta i kapacitetsbedömningen för samtliga komponenter. Nätet kommer att användas hårdare i framtiden och för att utnyttja nätets fulla kapacitet krävs åtgärder för en mer exaktbedömning av den outnyttjad kapaciteten.Det resultat som framkommit i arbetet visar att vikten av att införa en ny rate, en kapacitetsgräns för apparater och en funktion för att i en större omfattning kunna bedöma elnätets dynamiska kapacitet i realtid i form av väderområden förfinar och optimerar nuvarande driftövervakning.

Abstract [en]

This thesis is carried out on behalf of Vattenfall Eldistribution. As parties within the company believe that operational monitoring today is somewhat conservative and traditional. The goal is to clarify the current monitoring philosophy and try to find any improvements and changes that can be introduced in Vattenfall's electricity distribution's governing documents and operational monitoring system. Electric power transmission is an efficient and flexible way of transporting energy. However, the transmission capacity of an electricity network is limited, and the limitation is determined by the capacity limits of the components. The limitations are usually of a thermal or mechanical nature, and sometimes even a combination of these. The power system can consist of several components, such as overhead line sections, cable sections, disconnectors, switches, current and power transformers and relay protection. The report shows that overhead lines are the component that limits the transmission capacity of the system the most, followed by current transformers. The rated current is the current that sets the limitation on the transmission capacity of the overhead lines, it is based on continuous operation and under certain conditions where the environment's ability to cool is crucial. When calculations of the transmission capacity are performed, parameters with the worst possible cooling ratio are assumed. The estimation of the transmission capacity is not always in accordance with how the alarm limits are determined, because the alarm limits are determined with caution as it is a help function for the operating operators. The alarms are a tool for the operator that always requires an active action. The overload capacity is linked to aging and breakdowns, but also to plant safety. The report shows that appliances and cables are generally something that is not overloaded while overhead lines and transformers are assumed to have room for it. All components are dependent on their environment, but still this is not taken into account in the capacity assessment for all components. The network will be used harder in the future and in order to utilize the network's full capacity, measures are required for a more accurate assessment of the available capacity. The results that have emerged from the thesis shows the importance of introducing a newrate, a capacity limit for appliances and a function to be able to assess the dynamic capacity of the electricity grid in real time to a greater extent in the form of weather areas refines and optimizes current operational monitoring.

Place, publisher, year, edition, pages
2021. , p. 43
Keywords [sv]
Elkraft, övervakning
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-16290Local ID: EXE511OAI: oai:DiVA.org:hv-16290DiVA, id: diva2:1527899
Subject / course
Electrotechnology
Educational program
Elektroingenjör - Elkraft
Supervisors
Examiners
Available from: 2021-02-22 Created: 2021-02-12 Last updated: 2021-02-23Bibliographically approved

Open Access in DiVA

fulltext(1036 kB)320 downloads
File information
File name FULLTEXT01.pdfFile size 1036 kBChecksum SHA-512
b81da19d645af452cc707b8015ca574f5a532a16d592d4ea9a4cec36b85e53027429fde4468ca72e2c42a5e15b5b2fbf979ecdd4a0fb0bf9ad20f65110356ebd
Type fulltextMimetype application/pdf

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 320 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 581 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf