Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Projektkalkylering: En projektkalkyl för prototypverkstad och designcenter
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2020 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Project cost calculation (English)
Abstract [sv]

TechRoiEngineering AB, vidare benämnt TechRoi, är ett teknikföretag inom ingenjörstjänster som erbjuder kunder teknikkonsulter, IT och designlösningar samt prototyptillverkning. Projektkostnadskalkyler utförs av företaget med hjälp av en egenhändigt skapad mall i Microsoft Excel. Syftet med studien är att skapa ett verktyg i Excel som ska öka TechRois kunskap kring hur arbetstiden och kostnaderna i prototypverkstaden och designcentret fördelas mellan olika projekt. Målet ä ratt skapa ett verktyg för att offerera nya projekt, styra aktuella projekt samt utvärdera avslutade projekt med hänseende till arbetstid och kostnader. Offertkalkylen är den sidan i TechRois kalkylmall som används för att fylla i hur många timmar ett projekt beräknas binda i designcentret och prototypverkstaden samt externt beräknade kostnader. Sammanställningen i kalkylmallen är skapad med syfte att etablera en överblick över projektet samt att kunna jämföra projektets beräknade kostnader med slutpriset till kund. Studien har mynnat ut i en projektkalkyl vilken är skapad som ett komplement för offertkalkylen och sammanställningen i kalkylmallen. Syftet med projektkalkylen är att den ska vara ett verktyg som används genom hela projektets livscykel. Projektkalkylen kan användas redan när projektets offert skapas som en känslighetsanalys. Det möjliggör beräkning av ökade kostnader före projektet påbörjas för att undvika negativt resultat. Under projektets genomförande är det möjligt att kontinuerligt uppdatera timmar och kostnader för att kunna styra projektet. Om projektkalkylen kontinuerligt fyllts i under projektets gång kommer projektkalkylen då att fungera som en efterkalkyl. Projektkalkylen kan användas som känslighetsanalys, uppföljningskalkyl och efterkalkyl.

Abstract [en]

TechRoi Engineering AB, TechRoi, is a technology company within engineering services that offers technology consultants, IT and design solutions as well as prototype manufacturing. In order to supervise the different areas an inhouse created excel template is being used for project cost calculations. The aim of the study was to create a tool in Excel that will increase TechRoi's knowledge about how working time and costs is divided between projects connected to the prototype workshop and the design center. Additional to the first goal a tool to manage proposals for new projects, manage the evaluate projects in terms of working time and costs was created. The quotation calculation is the page in the template that is used to fill in how many hours a project is estimated to the design center and prototype workshop as well as externally calculated costs. The summary page is created with the aim of creating an overview of the project and enabling a comparison between projects calculated costs and the price to the customer. The project calculus is created as a complement for the quotation calculation and summary page. The purpose of the project was to create a project calculation tool that is used throughout the project life cycle. The project calculation can be used as early as when the project quotation is created as a sensitivity analysis. This means that it is possible to know before the project starts how much costs can increase before the project shows an economically negative result. During the implementation of the project, it is possible to continuously update hours and costs in order to control the project. If the project calculation has been continuously completed during the project, all values will be filled, and the project calculation will then act as a project costing.

Place, publisher, year, edition, pages
2020. , p. 30
Keywords [sv]
Teknikkonsulter, kostnadskalkyler
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:hv:diva-15804Local ID: EXM503OAI: oai:DiVA.org:hv-15804DiVA, id: diva2:1466468
Subject / course
Mechanical engineering
Educational program
Industriell ekonomi
Supervisors
Examiners
Available from: 2020-09-17 Created: 2020-09-11 Last updated: 2020-09-17Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 450 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf