Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Beredningshandling för nytt bostadsområde i Sunningebergen
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2020 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Project planning of a new 0,4 / 10 kV power grind distribution for Sunningebergen (English)
Abstract [sv]

Examensarbetet omfattar en beredningshandlingsplan för elnätet på 0,4 / 10 kV i Sunningebergen i Uddevalla Kommun. Sunningebergen är ett område utanför Uddevalla centrum i Herrestad.

Beredningen i denna rapport är en förberedelse inför att detaljplanen för området ska färdigställas. Beredningen kommer att utföras av Uddevalla Kommun Elnät AB. Rapporten omfattar ett projekteringsunderlag utfört av Uddevalla Kommun där dock inget projekteringsunderlag är gjort för elnätet. Det projekteringsunderlag som Uddevalla Kommun framställt används som grund för beredningen. Projekteringsunderlaget innehåller information om antalet hushåll och vilka samhällstjänster som kommer att finnas inom området.

Examensarbetet ger en ger en inblick i hur en elnätsberedning brukar gå till och det visar även hur beredningen av Sunningebergen föreslås gå till. För att uppfylla de krav, regler och riktlinjer som ställs på eldistributionsföretagen för att upprätthålla en stabil leveranssäkerhet behövs ett tryggt och stabilt omkringliggande nät för att det nya elnätet ska kunna påbörjas. För att se ifall omkringliggande nät kommer klara av att försörja Sunningebergen på el görs omfattande beräkningar på högspänningssidan.

I rapporten finns beredningskartor för hög- och lågspänningsnätet samt kostnadskalkyl utförd enligt EBR's kostnadskatalog. Området Sunningebergen beräknas ha en maximal effektförbrukning på 2040 kVA. Detaljplanen innefattar 150 småhus/villatomter, 71 rad- och parhus, 2 punkthus, en samlingslokal och en förskola. Högspänningsnätet kring Sunningebergen har en total kapacitet på 20 000 kVA innan inkoppling av Sunningebergen, medan matarstationen för området har en total kapacitet på 36 000 kVA. Inom området kommer det placeras tre 800 kVA nätstationer med ett maximalt strömuttag på 1150 A vardera. De ger en gemensam effekt på 2400 kVA. Maxförbrukningen för Sunningebergen beräknas landa på 2040 kVA, vilket är 85% av märkeffekten. På lågspänningsnätet innefattar arbetet 52 nya kabelskåp från CDC-serien, 5,5 km matarledningar och 5,2 km serviskablar. Kostnaden för projektet beräknas enligt kostnadskatalog P1 från EBR. Projektets totalkostnad landar på 6,1 miljoner SEK

Abstract [en]

This thesis includes a project planning for the power grid distribution 0,4 / 10 kV in Sunningebergen, Uddevalla Kommun. Sunningebergen is an area outside the center of Uddevalla in Herrestad.

The preparation in this report is a planning before finalizing the detailed plan for the area Sunningebergen. The preparation will be done by Uddevalla Kommun Elnät AB. The project includes a detailed plan developed by Uddevalla Kommun which contain facts about households and community services that will be in the area.

The thesis gives an insight in power grid preparation and how the preparation of the area Sunningebergen will be. To fulfill the requirements, rules, and guidelines set by the electricity grid companies to maintain a good power quality to the costumers, a secure and stable electricity grid are in need

In the report there is 0,4 / 10 kV maps over the area and it also includes a costing table. Sunningebergen will have a max capacity of 2040 kVA. The total capacity of the three transformer substations will be on 2400 kVA. This means that the area will have a load on 85% of max capacity. The high voltage grid has before the connection of Sunningebergen a peak load of 20 000 kVA as compared to the total capacity 36 000 kVA. There will be 2.2 km of transmission line. In the low voltage system, there will be fifty-two cabinets from ABB's CDC-series, 5,5 km feeder and 5,2 km of supply service line connection. The calculation for the preparation has been done with EBR's P1 calculation catalog. The total cost is estimated to be 6,1 million SEK.

Place, publisher, year, edition, pages
2020. , p. 36
Keywords [sv]
Handlingsplan, elnät, beredningsplan
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-15389Local ID: EXH300OAI: oai:DiVA.org:hv-15389DiVA, id: diva2:1453037
Subject / course
Electrotechnology
Educational program
Högskoletekniker, elkraft
Supervisors
Examiners
Available from: 2020-07-22 Created: 2020-07-08 Last updated: 2020-07-22Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 316 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf