Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utvärdering för att främja AMS i relation till planerat SAIDI i Vattenfalls distributionsnät
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2019 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Evaluation to promote Live Working in relation to planned SAIDI in Vattenfall’s distribution grid (English)
Abstract [sv]

Vattenfall Eldistribution AB eftersträvar att upprätthålla god elleveranssäkerhet till kund isitt distributionsnät. Det åsyftar idealt sett till att inga kundavbrott får inträffa till följd avoförutsägbara nätstörningar, eller som konsekvens av planerade arbeten. Energimarksnadsinspektionen (Ei) är tillsynsmyndighet över energimarknaden och reglerar Vattenfalls intäktsram med hänsyn till utfallet för nyckeltalet System Average Interruption Duration Index (SAIDI).Med avsikt att förbättra SAIDI, vid planerade arbeten, tillämpas företrädesvis avbrottsfriaarbetsmetoder, vilket inkluderar AMS (Arbete Med Spänning).

Vattenfalls distributionsnät är uppdelat i tio avtalsområden där en entreprenör, efter att halämnat ändamålsenligt anbud, vinner upphandlingen för respektive avtalsområdes serviceavtal. En entreprenör (Entreprenör A) innehar serviceavtalet för samtliga avtalsområdengällande rapportens mätperiod år 2016–2018. I dagens distributionsnät byggs ofta kompaktnätstationer med helisolerade ställverk, vilket hämmar entreprenörers tillämpning av AMSpå grund av för trångt konstruerade utrymmen samt därigenom otillräckliga säkerhetsavstånd. Likaså hämmas AMS vid nätuppbyggnad bestående av hög andel markkabel däranslutningspunkter för förbikopplingsenheter saknas.

Driftorderstatistik från mätperioden år 2016–2018 har analyserats och sammanställts för attutröna olika entreprenörers, avtalsområdens och stationers förhållningssätt till AMS.Upprättade driftorder uppgick år 2018 till 2969 varav 17,48 % upprättades AMS, vilket harminskat sedan år 2016 där AMS upprättades för 22,86 % utav 2616 driftorder. Orsaken kanbero på ökat antal investeringsarbeten med lägre andel AMS jämfört med underhållsarbeten.Avtalsområde 5, 9 och 10 har lägst SAIDI, vilka kan undersökas vidare avseendeförutsättningar för AMS; med eventuell implementering av undersökningens resultat i avtalsområden med hög SAIDI, såsom Avtalsområde 1 och 4.

Vattenfall bör leda vägen till ett ökat samarbete och dialog mellan dem själva ochupphandlade entreprenörer med syfte att främja AMS. Entreprenörers erfarenhet ochkunskap ifrån riskidentifikation och AMS-hämmande anläggningskonstruktion är av högtvärde för framtida elnätskonstruktion. Vidare anses att serviceavtalens målkort bör innehållabonusgrundade nyckeltal för andel upprättade AMS-arbeten. Endast 13,75 % av unikaentreprenörer erhöll år 2018 en AMS-driftorder. Vattenfall bör undersöka orsaken tillminskningen och utvärdera lönsamheten av en påtaglig subventionering av AMSutbildningar, material och utrustning, vilket kan jämföras med tillkomna extrakostnader förArbete Utan Spänning, såsom avbrottsavisering och avbrottsersättning.

Abstract [en]

Vattenfall Eldistribution AB is striving towards maintaining high service reliability for customers in their distribution grid. This ideally implicates that power outages cannot occur from neither unpredictable disturbances, nor as a direct result of planned work. The supervisory authority for the energy markets, The Swedish Energy Markets Inspectorate (Ei) regulates and limits Vattenfall’s revenue based on the key performance indicator (KPI) System Average Interruption Duration Index (SAIDI). To improve SAIDI it is preferential using working methods causing no power outages, where the method of Live Working (AMS) is included.

Vattenfall’s distribution grid is divided into ten contract areas where one entrepreneur, after leaving a suitable proposal, wins the solicitation process for either of these contract areas’ service agreement. A single entrepreneur (Entrepreneur A) holds all service agreements during this study’s interval (year 2016–2018). There is a high prevalence of compactly built substations today, usually built with fully insulated switchgear, which due to a lack of working clearance and cramped working spaces inhibit the prospect for AMS. A high prevalence of underground cable also inhibits AMS due to difficulties connecting bypassing units.

A statistical evaluation and compilation of switching orders was conducted and used to determine how AMS is affected by prerequisites and limitations in relation to entrepreneurs, contract areas and substations. The number of established switching orders was 2969 during the year of 2018, of which 17,48 % were established as AMS; which is a decline since year 2016 where 22,86 % of 2616 swiching orders were established as AMS. An increase in investment projects may be a cause for this decline, due to their lower amount of AMS compared to maintenance work. Lowest SAIDI was found in Contract Area 5, 6 and 9, where further studies regarding prerequisites for AMS could be considered, with intention to implement eventual findings in areas with high SAIDI, for instance Contract Area 1 and 4.

Vattenfall should increase cooperation and diaglogue between and themselves and solicited entrepreneurs with the aim of increasing the number of switching orders established as AMS. Entrepreneurs posess highly valuable knowledge and experience regarding risk identification and future construction possibilities. Goal cards in the service agreement could also contain KPI’s where a certain quota of AMS may entail a suitable bonus. Only 13,75 % av all unique entreprenurs conducted work using AMS year 2018. Vattenfall should research the cause for this decline and evaluate the profitability of substantially subsidizing AMS education and equipment for entrepreneurs, which could be compared to increased costs due to power interruptions from dead working (AUS), like customer notifcations and compensation.

Place, publisher, year, edition, pages
2019. , p. 84
Keywords [sv]
Eldistribution, elleveranser
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-14209Local ID: EXH300OAI: oai:DiVA.org:hv-14209DiVA, id: diva2:1338976
External cooperation
Vattenfall Eldistribution AB
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2019-07-25 Created: 2019-07-25 Last updated: 2019-07-25Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 3 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf