Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utredning av möjligheterna för solceller och energilager i västra delarna av Härjeåns elnät
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2019 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Investigation of the possibilities for solar panels and energy store in the west parts of Härjeåns grid (English)
Abstract [sv]

Detta examensarbete har utförts på uppdrag av konsultföretaget Rejlers Sverige AB på deras kontor i Göteborg. En kund åt Rejlers, Härjeåns Elnät, ser i framtiden en ökad exploatering av skidområden i västra Härjedalen med ett ökat effektbehov som följd. Arbetet är en utredning ifall den belastningsökning som väntas mellan år 2025 och 2035 på två av transformatorstationerna skulle kunna produceras av solceller och sedan lagras i batterier, alternativt att det skulle kunna avlasta transformatorerna från de högsta toppeffekterna. Vidare har det också undersökts ifall en ny planerad 40 kV-ledning kan dimensioneras och byggas med en lina av diameter som endast kräver enkelstolpar, för att på sådant sätt spara pengar jämfört med linor som kräver portalstolpar.

Under arbetets gång har belastningsdata från elnätsägaren analyserats och jämförts med hur ökningen av effektbehovet ser ut för området, vilket har gett en ny belastningsprofil att utföra beräkning kring solceller, energilager och effektflöden på.

Rapporten visar att i dagsläget, med tillgänglig teknik på marknaden, finns det inget alternativ som kan bidra med den effekt och den energi som krävs för att uppfylla önskat behov och samtidigt vara ekonomiskt försvarbart att investera i. Det anläggningarna uppskattas att kosta är väsentligt högre än kostnaderna för att förstärka elnätet på traditionellt vis. Däremot visade det sig att den projekterade belastningen för år 2035 endast kommer behöva en lina av diameter 329mm² istället för 454mm². Den kommer då kunna byggas med enkelstolpar och det uppskattas att bli drygt 19 miljoner kronor billigare jämfört med en byggnation med den grövre ledningen.

Abstract [en]

This bachelor's thesis has been carried out on behalf of Rejlers Sweden AB at their office in Gothenburg. A customer to Rejlers, Härjeåns, foresees a future exploitation in the ski areas located in the west parts of Härjedalen, resulting in a higher power demand. This thesis investigates if the expected load increase between year 2025 and 2035 in two of the transformer stations could be covered by local production in the grid from solar panels combined with battery storage, alternatively if it can reduce the transformer peak load. Further it has also been investigated if a new planned 40-kV transmission line can be dimensioned as a line with a dimension that only requires single poles instead of a construction with double poles.

During the work load data from the grid-owner has been analyzed and compared with the predicted load increase in the area. Based on this work a new load profile has been constructed and used during calculations on solar panels, energy store and loading of transformers and lines.

The results show that in current situation, with available technology, there is no option that could contribute with sufficient power and energy while being economically justifiable. The estimated investment cost is considerably higher than to strengthen the grid traditionally. For facilities such as solar panels and energy storage it is recommended to start in small scale. Based on the work performed it was shown that the predicted load for year 2035 only requires a transmission line of diameter 329mm² and that this line can be built with elemental poles.

Place, publisher, year, edition, pages
2019. , p. 40
Keywords [sv]
Elnät, exploatering, belastningsdata
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-13577Local ID: EXE511OAI: oai:DiVA.org:hv-13577DiVA, id: diva2:1290654
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2019-02-25 Created: 2019-02-21 Last updated: 2019-06-19Bibliographically approved

Open Access in DiVA

fulltext(1816 kB)347 downloads
File information
File name FULLTEXT01.pdfFile size 1816 kBChecksum SHA-512
926b3d5c4bdee0558721cd98515eb5a8357a07b6ad5583459e0226eb16511f6f378a598dc59ff5a985b9162413f3ff094b67f1250ca7ef03a6e94b3d93b46bd5
Type fulltextMimetype application/pdf

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 347 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 494 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf