Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Modernisering av el- och belysningssystem i en industrifastighet
University West, Department of Engineering Science, Division of Subtractive and Additive Manufacturing.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Modernization of electrical and lighting systems in industrial property (English)
Abstract [sv]

Detta examensarbete har utförts i AB Järn & Rörs lokaler i Lilla Edet. Projektet har varit att modernisera el- och belysningsanläggningen i lokalerna och även ta fram hur mycket en modernare belysning kan spara i energi. Lokalerna innefattar en metallverkstad, bilverkstad, hall, bad och omklädningsrum, personalrum, kontor och ett förråd. Projektet är utfört enligt nuvarande föreskrifter standarder och riktvärden ifrån Elsäkerhetsverket och arbetsmiljöverket. I samtliga lokaler har elsystemet utökats gällande antal uttagspunkter som bör finnas tillhands. Belysningen har uppgraderats ifrån 69 armaturer utrustade med två stycken 33 W T5 lysrör och ett fåtal halogenlampor. Till 59 armaturer utrustade med LED lysrör av olika styrka. Denna uppgradering har gjort att använd effekt till belysningen har minskat ifrån 4167 W till 2246 W vilket är en minskning med 1921 W eller 46 %. Ritningarna över elanläggningens samtliga delar har producerats med programmet EasyEl. Placeringen av armaturerna och ljusberäkningarna har gjorts i programmet DIALux.

Abstract [en]

This thesis has been carried out in AB Järn & Rörs premises in Lilla Edet, The project was to modernize the electricity and lighting in the premises, and also calculate how much a modernized lighting solution can save in energy. The premises included a metal workshop, garage, hallway, bath and dressing room, staff room, office and a storage room. The project has been carried out in accordance with current regulations, standards and recommendations from the Swedish National Electrical Safety Board and the Swedish work environment authority. The number of power outlets have been increased in all of the rooms to comply with current standards. The Lightning has been changed from 69 luminaries equipped with two 33 W T5 Light Tubes each and a few halogen lamps, to 59 luminaries equipped with LED light tubes of varying power. This change has decreased the amount of power required by the lighting system from 4167 W to 2246 W, which is a decrease of 1921 W or 46%. The electrical blueprints have all been created in the program EasyEl. The placement of the luminaries and the light calculations have all been made in the program DIALux.

Place, publisher, year, edition, pages
2018. , p. 48
Keywords [sv]
Energi, belysning, modernisering
National Category
Other Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-12777Local ID: EXH300OAI: oai:DiVA.org:hv-12777DiVA, id: diva2:1232321
External cooperation
ÅF consult AB
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2018-07-26 Created: 2018-07-11 Last updated: 2018-07-26Bibliographically approved

Open Access in DiVA

fulltext(1579 kB)757 downloads
File information
File name FULLTEXT01.pdfFile size 1579 kBChecksum SHA-512
657dba11affc592008c9d87c73832ce841a7b7ec2fa44c11ce1e972bb152955b1b0547e0f294022bd1a2791427e4f77664cd3569db597cc4345dd4a52adb6c0f
Type fulltextMimetype application/pdf

By organisation
Division of Subtractive and Additive Manufacturing
Other Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 762 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 314 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf