Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Beredning av lokalnät Ängås, Etapp 3
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Preparation work of the local power grid in Ängås, stage 3 (English)
Abstract [sv]

Examensarbetet berör ett beredningsarbete för TROLK El och Tele AB, på uppdrag av Ellevio. Beredningsarbetet behandlar exempelvis fältbesök, konstruktion av ledningskartor, tillstånd- och avtalssökning samt nätberäkning. Examensarbetet har arbetats vid sidan av att samma etapp redan beretts av beredare på företaget, vilket möjliggjort jämförelse i slutskedet av vårat arbete med företagets beredning. Syftet med denna beredning är att uppnå högre driftsäkerhet och därmed byta ut befintligt luftledningsnät till markkabel. Detta för att minska de långa avbrottstiderna i området som idag är ett problem, bland annat på grund av ledningarnas ålder och salthaltiga vindar. Det aktuella området är beläget i Ängås, Svanesund på sydöstra delen av Orust. Arbetet har begränsats till Etapp 3 som berör totalt 43 stycken abonnenter och är en av fyra etapper i området. Nätet består idag mestadels av luftledning av både låg- och mellanspänning, 0,4–12 kV. Etappen omfattas av fyra stycken stolp- och två markstationer som ersätts av fyra seriesatellit- och två stycken ELIT-stationer. Det uppförs även 12 stycken nya kabelskåp. Resultatet av beredningen är att cirka 10,6 km luftledning planeras att raseras samt att cirka 12,8 km markkabel bereds. Dessa kablar har dimensionerats för att uppfylla de villkor som gäller för nätberäkningar. En kostnadsberäkning för beredningen har upprättats enligt Ellevios interna enhetsprislista. Den totala slutkostnaden för projektet beräknas uppgå till 3,1 miljoner kronor. En beredningspärm har upprättats där samtligt material finns tillgängligt hos TROLK El och Tele AB i Uddevalla

Abstract [en]

This thesis concerns a preparation work for TROLK El and Tele AB, commissioned by Ellevio. The preparation work covers field visits, construction maps, power grid calculation, state and contract search. The thesis work has been accomplished in addition to the same stage already being prepared by preparers at the company, which enabled comparison in the final phase of our work with the company's preparation. The purpose of this work is to achieve higher operational reliability and thus replace existing overhead cable with underground cable. This is to reduce the long interruptions in the area, which today is a problem, partly due to the ages of the lines and the salty winds. The current area is located in Ängås, Svanesund in the south eastern part of Orust. The work has been limited to Stage 3, which concerns a total of 43 subscribers and is one of four stages in the area. Today, the power grid consists mostly of overhead lines, both low and medium voltage, 0.4 to 12 kV. The stage consists of four pole-mounted and two ground stations replaced by four seriesatellite- and two ELIT-stations. There are also 12 new cable cabinets. The result of the preparation is that approximately 10.6 km of overhead lines is scheduled to be demolished and approximately 12.8 km of underground cable is being prepared. These cables have been dimensioned to meet the conditions for network calculations. A cost calculation for the preparation has been planned according to Ellevio's internal unit price list. The total final cost of the project amounts to SEK 3.1 million. A preparation binder has been established where all material is available at TROLK El and Tele AB in Uddevalla

Place, publisher, year, edition, pages
2018. , p. 40
Keywords [sv]
Elnät, beräkningar
National Category
Other Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-12745Local ID: EXH300OAI: oai:DiVA.org:hv-12745DiVA, id: diva2:1232225
Subject / course
Electrical power technology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2018-07-26 Created: 2018-07-11 Last updated: 2018-07-26Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Other Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 102 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf