Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Nätplan för fördelningsstation M5 Hålta
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
University West, Department of Engineering Science, Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering.
2018 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Grid plan for transformer substation M5 Hålta (English)
Abstract [sv]

I Tjuvkil på västkusten, cirka 16 kilometer väster om Kungälv centrum, planeras ett nytt bostadsområde med ungefär 140 nya bostäder och fritidsbostäder som skall bli permanentbostäder. En nätplan skall därför upprättas för att ta reda på om det föreligger några brister i 10 kV-nätet, både innan och efter införandet av den nya belastningen med bostäder, plus extra utrymme för installation av laddstolpar.

Syftet med det här examensarbetet är att sammanställa den nätplan som ska utgöra underlaget för elnätet under fördelningsstation M5 Hålta, vilken inrymmer områden för nybebyggelse. Med programvaran dpPower simuleras och synliggörs nätets svaga punkter som tunna kablar där stora belastningsströmmar och spänningsfall uppstår, och även hur avbrottsstatistiken ser ut för de 5 utgående linjerna från M5. Arbetet tar också reda på transformatorns status i Hålta och kringliggande fördelningsnäts status när de reservmatar M5. I 4 steg visar den här rapporten statusen på elnätet för det befintliga läget, med planerad belastning, reservdrift och åtgärdsförslag.

Rapportens åtgärdsförslag till M5 Hålta resulterar i ett förslag om kabelbyte på linjen L501 mot Tjuvkil, vilket ger lägre spänningsfall och lägre belastningsström, och avbrottssäkrare linje. Reservdrift saknas till en stor energiförbrukare och kan lösas med tillbyggd slinga istället för radial matning på linje L503. Transformatorn M5 i Hålta är redan idag hårt belastad och behöver bytas ut så småningom. Rapporten ger kopplingsförslag till reservdriften med intilliggande fördelningsstationerna M1, M4 och M6.

Abstract [en]

In the area of Tjuvkil on the west coast, about 16 kilometers west of Kungälv city, a new residential area is about to be planned for about 140 new houses and holiday houses turned into permanent houses. A grid plan will therefore be made to investigate if there are any flaws to consider for the 10 kV-net, before and after the introduction which the new load will cause on behalf of the houses, plus extra space for the installation of an amount of charging posts.

The purpose of this thesis is to compile the grid plan which will make the groundwork for the power distribution grid under the M5 transformer Hålta, which contains the areas for the new settlement. Backed up by the software dpPower this work will point out the flaws such as thin cables where large load currents and voltage drop occur, and also the statistics for interruption for the five outgoing lines from M5. This work also shows the status for the transformer in Hålta and how the surrounding grids status will be affected during their backup of emergency power for the M5. This work shows the grid status in the 4 steps as present status, with new load, emergency power and solutions.

The thesis's evaluation of M5 Hålta will result in a suggested change of cable for the line L501 to Tjuvkil, which will decrease voltage drop and lower load current to avoid interruptions on the grid. Emergency power is lacking for a large-scale consumer and can be fixed with a looped feeding instead of a single line feeding on line L503. The transformer M5 in Hålta is already heavy loaded and in need to be replaced by a larger transformer later on. The thesis gives a suggestion on how to connect the adjacent transformers M1, M4 and M6 for emergency power.

Place, publisher, year, edition, pages
2018. , p. 35
Keywords [sv]
Nätplan, elnät
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-12438Local ID: EXE510OAI: oai:DiVA.org:hv-12438DiVA, id: diva2:1213798
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2018-06-14 Created: 2018-06-05 Last updated: 2018-06-14Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Industrial Engineering and Management, Electrical- and Mechanical Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 609 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf