Redovisning av lantmäterimyndigheternas handläggningstider och hur de påverkar byggbranschen
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2017 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
A presentation of The Land Survey processing times and how they affect the building construction companies (English)
Abstract [sv]

Att behovet av bostäder är mycket stort och kommer att vara så under många år är välkänt. För att hantera det akuta läget behöver byggprocessen snabbas på.  Den 19:e januari 2017 publicerades en artikel på regeringens hemsida som beskriver att lantmäteriets handläggningstider behöver granskas då de långa handläggningstiderna saktar ner byggprocessen och därmed påverkar samhällsbyggnadsprocessen negativt.  Lantmäteriet är myndigheterna som, något förenklat, jobbar med att bestämma, reglera och stycka av fastighetsgränser. Detta innebär att lantmäteriet har en viktig roll i Planprocessen. Framförallt under detaljplanearbetet.  Denna C-uppsats har genomförts på Högskolan Väst med syfte att undersöka hur lantmäteriets handläggningstider påverkar bygg och fastighetsbolagen.

 Av Sveriges 39 kommunala lantmäterimyndigheter har 29 bidragit med handläggningsstatistik. Studiens resultat har visat att handläggningstiderna på kommunala lantmäterimyndigheterna i snitt är 47,5 veckor 2016 Hos statliga lantmäteriet låg motsvarande värde 2016 på 55,1 veckor. Studien indikerar ganska tydligt att handläggningstiderna är för långa med tanke på vad byggbranschen har för krav. Majoriteten inom byggbranschen anser att en handläggningstid längre än 26 veckor är orimligt i de flesta typer av ärenden.  I övrigt har studien visat att byggbranschen är nöjd med lantmäteriets prestationer.  2016 trädde en ny paragraf i kraft i ledningsrättslagen som ska ge rätt till bredband för alla Sveriges invånare inom max 4 månader efter ansökan.  Detta innebär att lantmäteriet kan bli tvungna att ge förtur i dessa typer av ärenden och därmed kan övriga handläggningstider komma att påverkas. Resultatet har visat att det finns fyra möjligheter att få förtur i kön men om den nya regeln i ledningsrättslagen har påverkat handläggningstiderna är idag för tidigt att säga.   

Abstract [en]

That the need for housing is very large and will continue to be so for many years in Sweden is well known. To handle the emergency situation, the construction process needs to speed up.  On January 19, 2017, an article was published on the Swedish government's website describing that the survey processing times have to be reviewed. The long processing times are slowing down the construction process and thus adversely affect the construction process in a negative way. The National Land Survey is an authority that works to measure, regulate and distribute cadastral boundaries. This means that The National land survey has a major role in the plan process and because of that a significant impact on the time of the plan process. Especially during the work on detail plans. This bachelor thesis has been carried out at the University West, Sweden, with the purpose of investigating how Sweden’s survey agencies administrative processes affect the construction process.

 Of Swedens 39 municipal survey agencies, 29 have contributed with processing statistics. The study's results have shown that the processing times of municipal surveyors on average are 47.5 weeks in 2016. At the Land Survey, the corresponding equivalent value is 55.1 weeks in 2016. This study clearly indicates that processing times are too long given to what the construction industry is looking for. A majority in the construction industry are saying that a processing time that is longer than 26 weeks is unreasonable in most cases. Although this study has shown that, the construction industry is overall satisfied with the work carried out by the survey agency. In 2016, a new section came into law that will give rights to a broadband connection within a maximum of four months after the application. This means that the survey agencies may be required to give priority to these types of cases, and thus administrative processing times may be affected. The result has shown that there are four different possibilities for getting priority in the line, however, it is too early to state with certainty that the processing times will be affected by the new law.   

Place, publisher, year, edition, pages
2017. , p. 47
Keywords [sv]
Handläggningstider, Lantmäteriet, Byggbranschen, Kommunala lantmäterimyndigheterna
National Category
Communication Systems
Identifiers
URN: urn:nbn:se:hv:diva-11463Local ID: EXM504OAI: oai:DiVA.org:hv-11463DiVA, id: diva2:1140103
Subject / course
Land surveying
Educational program
Lantmäteriingenjör
Supervisors
Examiners
Available from: 2017-09-12 Created: 2017-09-11 Last updated: 2017-09-12Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Computer, Electrical and Surveying Engineering
Communication Systems

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 116 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf