Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Analys av ett distributionsnät i en bangård
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
An analysis of an electrical distribution system in a railway yard (English)
Abstract [sv]

En undersökning av en eldistributionsanläggning i en bangård har utförts på begäran av företaget Atkins Global AB. Anläggningen inkluderar elförsörjning till signalutrustning, uppvärmning av växlar och belysning för stationens plattformar.

Inledande studie inkluderade litteraturstudier om krav för den här typen av anläggning och insamlande av data rörande kablar och skydd i anläggningen. För det sistnämnda gäller att enbart säkringar av olika storlek skyddar antingen FXQJ eller AXQJ kablar av varierande storlek. Anläggningen matas normalt från en trelindad huvudtransformator via två centraler. Där central A1 matar signalutrustningen via kabelskåp F3 och belysningen med en huvudspänning på 400V och där central B1 matar utrustningen för uppvärmning av växlarna med en huvudspänning på 230V. Matningen från central B1 sker med två parallella kablar via kabelskåp FS4/36. Det finns även en hjälpmatning från en mindre transformator in till F3 om bortfall av ordinarie matning från A1 skulle ske.

Anläggningen undersöktes med beräkningsprogrammet; MyEcodial från Schneider Electric, med hänsyn till om det fanns personskydd och överlastskydd. Resultatet blev en serie av ändringsförslag rörande säkringar och kablar i anläggningen.

I den del av anläggningen som försörjer signalutrustningen rekommenderas att, till en av de befintliga signalkioskerna, ett kabelbyte utförs till en AXQJ 3x95/29 kabel och att en strömmätning rörande om befintlig 100A säkring kan sitta kvar eller om en ny 80A säkring bör sättas in utförs. Från F3 till både hjälpmatningen och A1 måste en ny säkring på 200A sättas in för att garantera skydd för befintlig kabel. För belysningskretsen var det problem med selektiviteten då båda befintliga säkringar har märkströmmen 63A, undersökningen visade att den undre av säkringarna bör bytas ut till en ny säkring med högst märkströmmen 50A och minst 32A. Rörande kretsen som matar utrustningen för uppvärmning av växlarna är det även här nödvändigt med en strömmätning, detta för att se om det är möjligt att närmast centralen A1 byta ut den nuvarande 400A säkringen mot en mindre 315A säkring. Om inte detta byte är möjligt måste två kablar av samma storlek som de befintliga kopplas in parallellt med befintliga kablar för att garantera att det finns personskydd för kretsen.

Abstract [en]

An analysis of an electrical distribution system located in a railway yard have been requested by Atkins Global AB. The system includes electrical distribution to signal equipment, heating equipment for the switches and lightning for the platforms.

The initial part of the analysis consisted of a literature study regarding requirements for this type of system and the gathering of data regarding the cables and the fuses in it. The cabling are either of the type FXQJ or AXQJ. The system is normally powered from a three-winding transformer via two centrals, the first central A1 supplies the signal equipment electricity, through the subcabinet F3, and the lightning both powered by a main voltage 400V and central B1 powers the equipment for heating the switches with the main voltage 230V. The distribution from B1 consists of two parallel cables feeding a subcabinet FS4/36.There also exists an auxiliary power supply from a smaller transformer T3, used if the main power supply should disappear.

The remaining investigation was conducted in the calculation program MyEcodial by Schneider Electric. The investigation focused on personal safety and short current calculations. The result was a series of suggested changes regarding the fuses and cables in the system.

The results of the investigation regarding the powering of the signal equipment was such that a recommendation to change the cable going from F3 to one of the signal cabinets to an AXQJ 3x95/29 cable and to conduct a current measurement regarding if the present 100A fuse can remain or if it should be switched to an 80A fuse. From F3 to both the main power supply and the auxiliary power supply new fuses with 200A must be put in to ensure that the cables are protected. For the powering of the lightning it was the selectivity between the fuses that was the problem since they both had the size 63A, the investigation proved that it was the lower fuse that should be replaced with a fuse with highest 50A and lowest 32A. Regarding the power supply for the heating of the switches it is once again necessary to do a current measurement to determ if it is possible to switch the present 400A fuse to a smaller one on 315A. If not then two more cables of the same size as the present ones must be installed parallel to the present ones to ensure safety for people.

Place, publisher, year, edition, pages
2017. , p. 29
Keywords [sv]
Eldistribution, signalutrustning, bangårdar
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-11197Local ID: EXM505OAI: oai:DiVA.org:hv-11197DiVA, id: diva2:1121462
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2017-07-12 Created: 2017-07-11 Last updated: 2017-07-19Bibliographically approved

Open Access in DiVA

fulltext(926 kB)659 downloads
File information
File name FULLTEXT01.pdfFile size 926 kBChecksum SHA-512
781e162a33737e93e68146c7b89e893b698cedd35f778d5f5cc353f61c84612c49543240e9b88bf172d7ac4db254e15d50837ea8d9abfbe8baf6931367e3cf93
Type fulltextMimetype application/pdf

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 662 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 567 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf