Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Beredning av distributionsnät i Tösse
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2017 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Preparation of a distribution network in Tösse (English)
Abstract [sv]

I denna rapport behandlas ett beredningsarbete som är innefattar ombyggnation av en mindre del av nätet i Tösse, Åmåls kommun. Det är gjort i samarbete med Vattenfall Service Nordic AB i Säffle. Det aktuella området innefattade en stolpstation, 1,5 km luftledning och 0,1 km kabel som skulle byggas om. Beredningen omfattar spänningsnivåerna 10/0,4 kV. Anledningen till att detta arbete utfördes är att personer i området hade klagat till Vattenfall på elkvaliteten. För att höja elkvaliteten skulle friledningen och stolpstationen raseras. Friledningen ska ersättas med kabel, stolpstationen ska ersättas med en markstation. Det ska även läggas till en ytterligare nätstation.

Beredningen i examensarbetet har utförts parallellt med en beredning på Vattenfall i Säffle, vilket betyder att det finns två förslag att välja mellan vid fortsättningen av projektet. I examensarbetet så har gruppen inte sökt några tillstånd, men hänsyn har tagits till de krav som finns. Beredningen utgick ifrån projektören på Vattenfalls lämnade förslag på hur det nya nätet kan läggas, gruppen har gjort ändringar på förslaget där det är nödvändigt. Beredningsarbetet har berört åtta kunder. Projektkostnaden uppskattas bli 1,03 miljoner SEK.

Det gjordes en jämförelse mellan torrisolerade- och oljeisolerade transformatorer. Detta gjordes eftersom gruppen vill utreda om det är ekonomiskt försvarbart att utföra ombyggnationer i nätet på ett mer miljövänligt sätt. Under jämförelsen var gruppen i kontakt med ABB som tillverkar både olje- och torrisolerade transformatorer. Gruppen kom fram till att det inte är försvarbart att investera i en torrisolerade transformator i detta projekt.

Abstract [en]

This report concerns a preparatory work of a distribution network in Tösse, Åmål County. This work has been done in cooperation with Vattenfall Service Nordic AB in Säffle. The area in question includes a pole-mounted substation, 1.5 km of overhead line and 0.1 km of cable. The preparation cover voltage levels of 10/0.4 kV. The reason why this work has been carried out is that people in the area have complained about the quality of the electricity to Vattenfall. In order to increase the quality will the previous overhead line and the polemounted substation be demolished. The overhead line will be replaced by cable, the polemounted substation will be replaced by a substation. There will also be an extra substation added.

The preparation work in the thesis was carried out in parallel with a preparation work at Vattenfall in Säffle, which means that there are two proposals to choose from on the continuation of the project. In this thesis, the group has not applied for any permits, but the requirements have been taken in consideration. This preparatory work emanated from the submitted proposal the planner at Vattenfall had for suggestion, the group made changes when necessary. This project will affect eight costumers. The estimated cost off the project is approximately 1.03 million SEK.

There was also a comparison made between dry-type and oil-immersed transformers. This was made to investigate if it's economically defensible to get the more environment friendly option between these two. The group was in contact with ABB whom is a major manufacturer of both types of transformers. The conclusion that the group came to after the comparison was that it's not viable to buy the more environment friendly dry-type transformer in this project.

Place, publisher, year, edition, pages
2017. , p. 26
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-11134Local ID: EXH300OAI: oai:DiVA.org:hv-11134DiVA, id: diva2:1120174
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2017-07-12 Created: 2017-07-05 Last updated: 2017-07-12Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 511 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf