Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Studier för utbyggnad av solcellsanläggning på 300 kW på Högskolan Väst
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2017 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Studies for development of solar cells at 300 kW in University West (English)
Abstract [sv]

Detta examensarbete utfördes på Högskolan Väst med syfte att undersöka förutsättningarna för att bygga ut en solcellsanläggning på 300 kW på Högskolan Västs tak. Inom detta examensarbete har solenergi, dess förutsättning undersökts och hur solinstrålning kan fångas upp av solcellerna som sedan omvandlas till energi. Vidare kommer detta arbete att handla om hur tekniken för solcellssystemet fungerar, d.v.s. komponenter som används för att omvandla solljuset till elenergi. Solcellernas elektriska egenskaper och hur växelriktare omvandlar likström till växelström har därmed undersökts. Studien har undersökt hur solcellssystemet är uppbyggt, hur tekniken fungerar och hur den ska anslutas till elnätssystemet. Vidare har studien även undersökt verkningsgraden för solcellerna. För att få kunna bygga en solcellsanläggning på Högskolan Väst och ansluta den till nätet så har det gjorts en undersökning angående utbyggnad och nätanslutning med hjälp av kontakter med Trollhättans Stad och Trollhättan Energi angående bygglov och krav vid anslutning. Den nuvarande solcellsanläggningen vid Högskolan Väst har undersökts och hur mycket energi som skolan förbrukar vid varje månad under år 2015. För att hitta bra förslag på anläggningar så har tre stycken företag: PPAM, Gothia Solenergi och Ten Star Solar kontaktas. I deras offerter erbjöds olika priser, olika årsproduktion, hur placeringen av anläggningarna kommer att se ut och hur stor yta anläggningen har totalt. Slutsatsen har dragits till att skolan ska bygga en solcellsanläggning med rekommenderad offert från Ten Star Solar som är billigast. Ten Star Solar har en årsproduktion på 242 MWh/år, en total effekt på 300 kW, är monterad på ett hållbart sätt och är anpassad för skolans tak. I arbetet har det tagits upp vilka framtida arbeten som bör studeras djupare, t.ex. kabeldragningar och hur anläggningen kan inkopplas till elnätet.

Abstract [en]

This thesis was conducted at University West with the purpose of examine the conditions of constructing a photovoltaic power plant with 300 kW at University West's roof. This thesis has studied solar energy and its condition, how solar irradiance or sunlight can be used by solar cells, transform into energy and how the technology of solar cells works, i.e. components which is used for transforming sunlight into electrical energy. The electrical components of photovoltaic cells and how inverters can convert direct current into alternating current has been investigated. This study has examined how the solar system is built, works and how to connect solar cells into the electrical grid system. This study has also examined the thermal efficiency of solar modules. To make it possible to build a solar photovoltaic plant and connect it to the network system, at the University West, the study has been in contact with the municipal of Trollhättan City and Trollhättan Energi AB, regarding building permits and requirements for network access. This exam has studied the current photovoltaic plant at University West and how much energy the university consumes at each month during the year 2015. To find a good proposal regarding photovoltaic plants the study has been in contact with three different suppliers of photovoltaic plants, PPAM, Gothia Solenergi and Ten Star Solar. These suppliers have offered different suggestions regarding prices, annual production, how the location of facilities at the university's roof will look like and the total area of the facility. The conclusion of this exam is that the university should buy the photovoltaic plant from Ten Star Solar, which has in its recommendation given the cheapest price in comparison to the two other suppliers. The suggestion from Ten Star Solar is to buy a photovoltaic plant with an annual production of 242 MWh/year and a total power around 300 kW. This photovoltaic plant have a sustainable mounting and is adapted for the university's roof.

Place, publisher, year, edition, pages
2017. , p. 31
Keywords [sv]
Solenergi, solcellssystem, Högskolan Väst
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-10961Local ID: EXH300OAI: oai:DiVA.org:hv-10961DiVA, id: diva2:1099182
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2017-06-14 Created: 2017-05-29 Last updated: 2017-06-14Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 245 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf