Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Anslutning av två vindkraftverk till befintligt nät
2017 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Connection of two wind turbines to existing power grid (English)
Abstract [sv]

Examensarbetet har utförts hos Högskolan Väst i Trollhättan samt hos Kungälv Energi AB i Kungälv. Som elnätsägaren har Kungälv Energi AB ansvar att bedöma om lokalnätet behöver förstärkas i samband med anslutning av nya elproduktionsanläggningar, bland annat av två nya vindkraftverk. Målet med denna rapport har varit att utföra en teoretisk undersökning av huruvida det befintliga kommunala 24 kV elnätet behöver förstärkas vid anslutning av två planerade vindkraftverk med en total effekt på 5,7 MW för att bibehålla spänningskvalitet. Utöver detta utreds alternativa kabeldimensioneringar för angivna anslutningsvägar till vindkraftverken, och presenteras en grov kostnadskalkyl till olika förstärkningsalternativ. I rapporten utförs spänningskvalitetsberäkningarna enligt hänvisningar från Anslutning av mindre produktionsanläggningar till elnätet – AMP då den avgörande inverkan av anslutningen begränsas till lokalnätet med endast marginell inverkan på regionnätsnivå. Av den orsaken att tillverkare av vindkraftverken ännu inte har bestämts, används för beräkningar data från det tidigare installerade vindkraftverket i Skåreby kallat "Vindrosen". Kostnadskalkylen har gjorts med hjälp av EBR, ElByggnads-Rationalisering. De olika kabeldimensioneringsalternativen som presenteras grundar sig i kostnader och långtidsplanering. Dessa dimensioner är 95 mm2 och 240-(nedgrävd kabel) alt. 241 mm2 (belagd lina). Förslag på omdimensionering av befintligt nät vid sammankopplingspunkten har presenterats. Samtliga alternativ på kabeldimensioneringar är konstruerade för 24kV för att matcha nätets spänningsnivå, då kostnaderna i annat fall blir orimligt höga. Kungälv Energi AB rekommenderas att ej ansluta vindkraftverken innan noggrannare beräkningar på övertoner görs i samband med eventuella övertonsmätningar. Detta för att beräkningarna enligt AMP inte bedöms vara precisa nog då faktorer som kabelkapacitanser inte inkluderas i formlerna. Vid upphandling av de nya vindkraftverken för projektområdet Dalen, rekommenderas det att Kungälv Energi AB bör sätta krav på maximalt tillåtna övertonsströmmar för de problematiska övertonerna.

Abstract [en]

This thesis was conducted at University West in Trollhättan and Kungälv Energi AB in Kungälv. Being owner of an electrical grid, Kungälv Energi AB has the responsibility to check if the electrical grid needs to be reinforced when connecting new electricity generation facilities such as two new wind turbines. This thesis mission is to examine how the voltage quality might be affected by the connection of the wind turbines and give suggestions on how to solve eventual problems. Several alternatives will be examined for how the cables between the wind turbines and the power grid should be placed. One cost calculation will be presented. The voltage quality calculations are done through the guidelines from AMP, Anslutning av Mindre Produktionsanläggningar. Because the provider of the wind turbines has yet to be decided, necessary data has been taken from the previously connected wind turbine in Skåreby, "Vindrosen". The cost calculations are done with the help of EBR, ElByggnadsRationalisering. The cable dimension alternatives that are presented are based on costs and long term planning. These dimensions are 95mm2 and 240 (underground transmission line)- alt. 241mm2 (overhead transmission line). The thesis also includes suggestions for alternative dimensioning of the currently placed power grid at the point of interconnection for the wind turbines. All presented alternatives of the dimensioning for the cables are solely 24kV in accordance with the rest of the power grid to avoid unnecessarily high costs. It is recommended that Kungälv Energi AB does not connect the wind turbines before more thorough calculations are made in conjunction with eventual harmonic distortion measurements. This is because the equations AMP refers to are deemed imprecise due to some parameters such as cable capacitance have not been taken into consideration. It is recommended that, during the negotiations of the new wind turbines, Kungälv Energi AB limits the maximum current harmonic distortions that the wind turbine produces.

Place, publisher, year, edition, pages
2017. , p. 30
Keywords [sv]
Elproduktion, kvalitet, elnät
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-10896Local ID: EXM505OAI: oai:DiVA.org:hv-10896DiVA, id: diva2:1084292
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2017-03-27 Created: 2017-03-24 Last updated: 2017-03-27Bibliographically approved

Open Access in DiVA

No full text in DiVA

Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 545 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf