Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Nätplanering L108E Gällserud: Sätergården & reservmatning Älgsjön
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2016 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Network planning L108E Gällserud : Sätergården & backup power supply Älgsjön (English)
Abstract [sv]

Nya bestämmelser och funktionskrav har införts i ellagen för att öka det förebyggande arbetet för en leveranssäker el överföring. Sedan den 1 januari 2011 har elkunder rätt till ersättning vid avbrott och detta har medfört att elnätsbolagen idag satsar stora resurser i att vädersäkra elnätet.

Mellanspänningsledningarna i området Lisjön i närheten utav Lysvik är utför som oisolerad luftledning. På grund utav hög anläggningsålder utförs en reinvestering genom att gräva ned kabel i marken och på så vis vädersäkra elnätet. En ny reservmatning mellan L108G-T2279 Randberg och L081E-T380 Älgsjön kommer också utföras i syfte att ytterligare förstärka nätet och bidra till en säkrare elleverans. Uppdraget utfört åt Ellevio AB är att skapa en projektpärm för vidare beredning. I projektpärmen ingår bland annat befintliga och nya nätkartor, befintliga och nya drift scheman, nätstations- och kabelskåps scheman samt en DIET-kalkyl.

Det nya nätet innefattar 6 stycken nya Seriesatelitstationer , 2 stycken nya ELIT3 nätstationer med frånskiljare samt 1 transformator med 10A Petersènspole. I projektet beräknas det att bli ca 8,5 km nya mellanspänningskablar och ca 4,8 km friledningsrasering. Det beräknas också tillkomma ca 6,2 km nya lågspänningskablar med tillhörande ca 3,5 km hängkabelsrasering. Konstruktionsspänningen på mellanspänningsnätet är 12kV och 0,4kV på lågspänningsnätet.

Abstract [en]

New rules and functional requirements have been introduced in the electricity act to increase the drive for a reliable supply of electricity distribution. Since 1st January 2011, the electricity customers are entitled to compensation for interruptions and this has led to that the electricity distribution companies today are investing significant resources to weatherproof their grids. Medium Voltage lines in the region Lisjön in the vicinity of Lysvik are today based on uninsulated overhead lines. Because of high age a reinvestment is needed. It will be performed by cableling into ground and by doing that the grid will be less vulnerable against disturbances in case of bad weather. A new backup supply between L108G-T279 Randberg and L081E-T380 Älgsjön will also be built with the view to further strengthening the network and contribute to a more robust electricity supply.

The project performed is to create a project portfolio for further processing. Including in the project portfolio there will be existing maps and new network maps, also including old and new network operation diagrams. There will also be enclosure operation diagrams and a DIET-calculation. 6 new Seriesatelitstations, 2 new ELIT3 Power stations with a disconnector and one transformer with 10A Petersèncoil.

The estimated length of the cable in the project is about 8.5 km and about 4.8 km line demolition. There will also be about 6.2 km new voltage cables with associated of about 3.5 km low voltage line demolition. The medium network construction voltage is 12kV and the low voltage network is 0.4 kV.

Place, publisher, year, edition, pages
2016. , 16 p.
Keyword [sv]
Kvalitetssäkring, elleveranser, elöverföring
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-10482Local ID: EXH300OAI: oai:DiVA.org:hv-10482DiVA: diva2:1061632
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2017-01-04 Created: 2017-01-03 Last updated: 2017-01-04Bibliographically approved

Open Access in DiVA

No full text

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

Total: 25 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf