Beredning av kabelnät i Follingbo på Gotland och kartläggning av olika förläggningsmetoder
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
University West, Department of Engineering Science, Division of Computer, Electrical and Surveying Engineering.
2016 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Preperation of the cable network in Follingbo on Gotland and survey of different methods for underground power cable (English)
Abstract [sv]

Detta examensarbete är uppdelat i två delar, en beredning och en kartläggning av olika förläggningsmetoder. Examensarbetet innehåller en allmän beskrivning om hur en beredning kan utföras, olika förläggningsmetoder, och en beredning utförd i Follingbo på Gotland Diskussionsdelen innefattar de olika förläggningsmetoderna medan den resulterande beredningen beskrivs i kapitel 4.

I dagsläget är det luftledning som försörjer kunderna i området. Med beredningen vill GEAB vädersäkra sitt elnät genom att förlägga luftledningen i mark. Etappen består idag av ca 4,6 km högspänningsledning och ca 2,5 km lågspänningsledning. Det planerade nätet består av ca 7 km högspänningskabel och ca 5 km lågspänningskabel.

Det ingår även 5 stycken nya nätstationer och 7 kabelskåp i projektet. All högspänning i etappen är 10 kV och lågspänningen är 0,4 kV.

Beredningen utfördes hos NEKTAB åt GEAB. Beredningen är tredje etappen av ett större projekt.

Abstract [en]

This thesis is divided into two parts, a preparation and a survey of the different methods for underground power cable. The thesis contains a general description of how the preparation can be carried out, different methods for underground power cable and a preparation made in Follingbo Gotland. The discussion section includes the different methods for underground power cable, while the resulting preparation is described in Chapter 4.

In the current situation there are air carried power lines supplying customers in the area. With the preparation GEAB wants to weatherproof its grid by placing air lines in the ground. The project consists of about 4.6 km high voltage overhead lines and about 2.5 km low-voltage cables.

The planned network consists of about 7 km high voltage cable and about 5 km low voltage cable. It also includes 5 new substations and 7 cable cabinets in the project. All high voltage is 10 kV and low voltage 0.4 kV. The preparation was performed on NEKTAB for GEAB. This preparation is the third stage of a larger project.

Place, publisher, year, edition, pages
2016. , p. 42
Keywords [sv]
Kabelnät, metoder, förläggning
National Category
Electrical Engineering, Electronic Engineering, Information Engineering
Identifiers
URN: urn:nbn:se:hv:diva-10025Local ID: XEL500OAI: oai:DiVA.org:hv-10025DiVA, id: diva2:1039098
Subject / course
Electrotechnology
Educational program
Elkraft
Supervisors
Examiners
Available from: 2016-10-24 Created: 2016-10-21 Last updated: 2016-10-24Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
Division of Computer, Electrical and Surveying Engineering
Electrical Engineering, Electronic Engineering, Information Engineering

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 166 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf