Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Lokalkraftsbehov i transformatorstationer
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avdelningen för data-, elektro- och lantmäteriteknik.
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avdelningen för data-, elektro- och lantmäteriteknik.
2016 (Svenska)Självständigt arbete på grundnivå (högskoleexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)Alternativ titel
Auxiliary power requirements in substations (Engelska)
Abstract [sv]

Denna rapport behandlar behovet av lokalkraft i Vattenfalls transformatorstationer. Tre vanligt förekommande transformatorstationer - stamstation, regionstation och fördelningsstation - har studerats. Alla transformatorstationer behöver lokalkraft för att fungera. Begreppet lokalkraft syftar till den matning som förser en transformatorstations utrustning med el. Apparater som försörjs av lokalkraften är bland annat motorer för brytare, transformatorkylning, kontrollutrustning, värme och belysning.

Ok-lindning är ett exempel på en lokalkraftslösning, vilket är det alternativ som Vattenfall vanligtvis använder. Denna lindning är placerad i huvudtransformatorn och består av ett fåtal varv runt järnkärnan. Spänningen från ok-lindningen är aldrig exakt 400 V och därför krävs en matchningstransformator. Rapporten beskriver även kort några andra lokalkraftslösningar samt några tillfälliga effektuttag.

Studien undersöker hur stort det teoretiska lokalkraftsbehovet är och vad det är för utrustning som har störst effektförbrukning i de tre stationstyperna. Effekterna delas upp i tre kategorier: ställverk, kontrollanläggning och lokal. Det beräknade lokalkraftsbehovet är i stamstationen 140 kVA, i regionstationen 54 kVA och i fördelningsstationen 25 kVA. Resultaten visar att det teoretiska lokalkraftsbehovet i samtliga studerade stationer är lägre än de standardstorlekar Vattenfall tillämpar som är på 400 kVA, 250 kVA och 100 kVA.

Abstract [en]

This thesis studies the auxiliary power requirement in Vattenfall's substations. Three common substations - national grid substation, regional grid substation and distribution grid substation - have been studied. All substations need auxiliary power to function properly. Auxiliary power is what powers the substation equipment, for example motor drives, transformer cooling, control equipment, heating and lighting.

Auxiliary winding is one solution to supply auxiliary power, which is the option that Vattenfall commonly uses. The winding is placed in the main transformer and consists of a few turns around the iron core. The voltage from an auxiliary winding is never exactly 400 V and a matching transformer is therefore required. The report also briefly describes a few other auxiliary power solutions and a few temporary power consumptions.

The study examines the theoretical auxiliary power requirements and what kind of equipment that has the highest power consumption in each of the three types of substations. The power consumption is divided into three categories, switchgear, control equipment and premises. The calculated auxiliary power requirement is 140 kVA for the national substation, 54 kVA for the region substation and 25 kVA for the distribution substation. The results show that the theoretical auxiliary power requirement in all of the studied substations is lower than the standard auxiliary winding sizes used by Vattenfall, which is 400 kVA, 250 kVA and 100 kVA.

Ort, förlag, år, upplaga, sidor
2016. , s. 24
Nyckelord [en]
grid substations, auxiliary power
Nyckelord [sv]
transformatorstationer, lokalkraft
Nationell ämneskategori
Elektroteknik och elektronik
Identifikatorer
URN: urn:nbn:se:hv:diva-9803Lokalt ID: EXH300OAI: oai:DiVA.org:hv-9803DiVA, id: diva2:955361
Ämne / kurs
Elektroteknik
Utbildningsprogram
Elkraft
Handledare
Examinatorer
Tillgänglig från: 2016-08-26 Skapad: 2016-08-25 Senast uppdaterad: 2016-08-30Bibliografiskt granskad

Open Access i DiVA

fulltext(2227 kB)554 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 2227 kBChecksumma SHA-512
8c3537153c881127be2def8f260e980edaaf90627a97706254aa99f7440092a03684fee22f008e1c17e7676c3c91e044dfa5db976a6f4b882bacce4d092dcf86
Typ fulltextMimetyp application/pdf

Av organisationen
Avdelningen för data-, elektro- och lantmäteriteknik
Elektroteknik och elektronik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 554 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 227 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf