Driftinformation
Ett driftavbrott i samband med versionsuppdatering är planerat till 10/12-2024, kl 12.00-13.00. Under den tidsperioden kommer DiVA inte att vara tillgängligt
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Beredning av låg- och högspänningsnät i Estenberga i Gullspång kommun
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avd för data- och elektroteknik.
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avd för data- och elektroteknik.
2014 (Svenska)Självständigt arbete på grundnivå (högskoleexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)Alternativ titel
Preparation of low and high power lines in Estenberga in Gullspång (Engelska)
Abstract [sv]

Detta examensarbete handlar om beredningsarbete i samhället Estenberga som ligger i Gullspångs kommun. På grund av dålig spänningskvalitet har nätägaren Fortum bestämt att ett nytt elnät måste upprättas. Beredning innebär att sköta kontakter med myndigheter och markägare för att ha alla tillstånd, avtal och bygglov klart innan entreprenören utför fältarbetet. Beredaren måste åka till det berörda området för att kontrollera terrängen och bestämma vart det är lämpligast att kablarna skall förläggas samt vart nätstationer och kabelskåp ska stå för att göra så litet avtryck i omgivningen som möjligt. Beredaren gör även en P2 kalkyl som beräknar vad hela projektet kommer att kosta för nätägaren. Detta projekt omfattar placering av två nätstationer, fem kabelskåp och totalt kommer 4,6 km kabel förläggas i mark. Tjugotre abonnenter har kontaktats för att ge information om förändringen som kommer att ske samt för att få markupplåtelseavtal och värderingsprotokoll påskrivna

Abstract [en]

This thesis is about the preparation work in the community EstenBerga, which is located outside the town of Gullspång. Due to poor power quality has the network owner Fortum decided that a new electricity network must be established. A preparation means to manage contacts with agencies and landowners to have all permits and agreements prepared before the contractor performs work in the field. The preparer must go to the place and check the terrain and decide where it is suitable to place the cables and where the substations and cable cabinets should be to do as little footprint in the environment as possible. The preparer also does a P2 spreadsheet that calculates what the entire project will cost the network owner. This project includes the placement of two substations, five cable cabinets and a total of 4.6 km cable placed in the ground. Twenty-three subscribers were contacted to inform them of the change that will happen and to get land lease agreement and the valuation protocol inscribed

Ort, förlag, år, upplaga, sidor
2014. , s. 12
Nyckelord [en]
Preparation, Maps, Planning
Nyckelord [sv]
Beredning, Projektering, P2 kalkyl
Nationell ämneskategori
Elektroteknik och elektronik
Identifikatorer
URN: urn:nbn:se:hv:diva-6870Lokalt ID: EXH300OAI: oai:DiVA.org:hv-6870DiVA, id: diva2:756878
Ämne / kurs
Elektroteknik
Utbildningsprogram
Elkraft
Handledare
Examinatorer
Tillgänglig från: 2014-10-20 Skapad: 2014-10-20 Senast uppdaterad: 2015-12-22Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Av organisationen
Avd för data- och elektroteknik
Elektroteknik och elektronik

Sök vidare utanför DiVA

GoogleGoogle Scholar

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 756 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf