Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Åtgärder för att minimera kommunikationsstörningar vid avläsning av elmätare via elnätet
Högskolan Väst, Institutionen för ingenjörsvetenskap.
2009 (Svenska)Självständigt arbete på grundnivå (yrkesexamen), 10 poäng / 15 hpStudentuppsatsAlternativ titel
Measures for minimising communication disturbances when reading electricity meters via the power grid (Engelska)
Abstract [sv]

Detta examensarbete tar upp frågan om kommunikationsproblem mellan de komponenter som ingår i ADDAX systemet, till största del de problem som uppstår mellan router och mätare. ADDAX systemet är uppbyggt på ett hierarkiskt vis med ADDAX server högst upp och mätaren längs ned. Systemet kommunicerar via PLC ”power line comunication”. Uppgiften har varit att kartlägga hur mätsystemet fungerar, vilka geografiska problemområden som finns med avseende på kommunikations problem, lokalisering av störkällor, åtgärdning av dessa störkällor och framtagande av ett flödesschema som skall kunna användas av montörerna vid felsökning i systemet. Arbetet inleddes med att ta fram underlag för vilka områden som påverkas av störningar i elnätskommunikationen. Detta gjordes med hjälp av programmet ”TC Meter Surv SA Edition 0.61” som arbetar mot ADDAX systemets databas för att se vilka mätare som är installerade och vilka som kommunicerar med systemet. Efter vissa problem togs två områden fram, ett på landsbygden och ett i centrala Grästorp. Vid mätning i dessa områden användes till en början två instrument, PL-monitor och HF+. HF+ visade sig vara överflödigt då samma information ges av PL-monnitor båda versioner visar på vilka störningsnivåer som finns i elnätet. HF+ är mer svårtolkat då användaren själv måste ta ställning till informationen som visas medan PL-monnitor enbart visar på den störning som stör ut kommunikationen. Då mätningarna genomförts och analyserats har det visat sig att programmet ej fungerat tillfredställande och att fel information om antal felaktiga mätare i de område som är beläget i centrala Grästorp, detta har resulterat i att en ny slutsats dragits där istället för en störning i LV nu problemet verkar ligga i MV. Kommunikations problemet på landsbygden kan troligtvis lösas med att installera filter hos de kunder vars mätare ej kommunicerar. Andra åtgärder som kan vara aktuella vid framtida kommunikationsproblem kan vara byta av kommunikations fas på mätaren, flytt av mätaren till matningsskåp, installation av repeterare eller att i samråd med kund få denna att stänga av störande utrustning vissa tider på dygnet. En slutsats som dragits av de erfarenheter som ackumulerats under projektets gång är att all mjukvara bör uppdateras och att master-routrar ersätts med en nyare version.

Abstract [en]

This report handles the issue of communication problems that appears between the components in the ADDAX system, mainly between the router and meter. The system is built around a hierarchy with the ADDAX server at the top and the meter at the bottom. The system uses the power grid as communication medium, this is called PLC “power line communication. The task has bin to se how the system works, witch geographical areas that have problems with communication, localization of source for the disturbing of the communication, attend to the disturbing and to make a flow chart that the electricians can use when they are conducting a measurement. A program called “TC Meter Surv SA Edition 0.61” was used for finding which areas that have problems with the communication. Two areas were chosen, one in the countryside and one in central Grästorp. The program firs showed that some meters where missing but when the measurements where don the program showed that all meters where missing. The reason for this problem is unknown. The problem in the central Grästorp area is not in the LV butt in the MV. The conclusion will be that al of the software must be updated and that the master routers could be replaced with a never versions before any new measurements are to be done. The power quality measurement instruments that has bin used are PL-monitor and HF+. On other conclusion that can bi don is that HF+ is superfluous because it chows the same information that PL-monitor dose but it’s harder to interpret. In the area on the countryside the solution to the communication problem can bi to install a filter. Other solutions to PLC problems can bi to switch the phase the meter uses for communication, move the meter farther from the customer, installing a repeater or in consultation with the customer get him or here to turn of the devise that disturb the communication under some ours in a 24-hour period.

Ort, förlag, år, upplaga, sidor
2009. , s. 33
Nyckelord [en]
ADDAX, PLC, PLC problems, electrik cuality
Nyckelord [sv]
ADDAX, elnätskommunikation, kommunikationsproblem, mätning av störningar, PLC
Nationell ämneskategori
Reglerteknik
Identifikatorer
URN: urn:nbn:se:hv:diva-1493OAI: oai:DiVA.org:hv-1493DiVA, id: diva2:216417
Presentation
(Engelska)
Uppsök
teknik
Handledare
Examinatorer
Tillgänglig från: 2009-05-08 Skapad: 2009-05-08 Senast uppdaterad: 2009-05-08Bibliografiskt granskad

Open Access i DiVA

fulltext(755 kB)1698 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 755 kBChecksumma SHA-512
8a16699b1adc529faede93ff23a294f4307d6539849ae9b909f118f37320994cd65e985b0f029d134329fadfd866a7e3b243b2f0aac1889c02c0fe2e8ef2dea1
Typ fulltextMimetyp application/pdf

Av organisationen
Institutionen för ingenjörsvetenskap
Reglerteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 1698 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 981 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf