Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
När ”påbörjas” en detaljplan?: en kartläggande studie om begreppet ”påbörjad”
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avdelningen för data-, elektro- och lantmäteriteknik.
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avdelningen för data-, elektro- och lantmäteriteknik.
2017 (Svenska)Självständigt arbete på grundnivå (högskoleexamen), 10 poäng / 15 hpStudentuppsats (Examensarbete)
Abstract [sv]

Den 1 januari 2015 trädde en del ändringar i plan- och bygglagen i kraft. Detta då den dåvarande regeringen ville uppnå en effektivare planprocess, för att öka bebyggandet i riket. Lagändringen påverkade planprocessen samt förutsättningarna till upprättandet av genomförandeavtal. Genom övergångsbestämmelserna lades dock ett förbehåll in, för att reglera i vilka situationer äldre lagstiftning skulle användas. Detta förbehåll är att en detaljplan ska vara ”påbörjad” innan 1 januari 2015. Denna studie syftar till att undersöka när en detaljplan är ”påbörjad”.  Studien grundar sig på att nu gällande plan- och bygglag (fortsatt kallat PBL) samt tillämpningen av denna undersöks utifrån olika metoder. För att tolka juridiken kring begreppet, har ett rättsdogmatiskt förhållningssätt använts genom olika tolkningsmetoder. För att få en förståelse för hur juridiken tillämpas har ett rättssociologiskt förhållningssätt nyttjats. Detta har skett genom att en enkätundersökning utförts, där Sveriges samtliga kommuner tillfrågats hur de tolkar begreppet.  Undersökningen har påvisat att begreppet ”påbörjats” är oklart. I PBL regleras inte vad en ”påbörjad” detaljplan är. De definitioner som Boverket och regeringen har tagit fram är oklart formulerade. Den enkätundersökning som skickades ut till alla Sveriges kommuner gav ett varierande resultat som styrker teorin om att begreppet ”påbörjad” detaljplan är oklart. De befintliga definitionerna är i behov av förtydligande, för att likrikta kommuners tillämpning av dessa övergångsregler. Enkätundersökningen visade att 67 % av kommunerna tolkat begreppet ”påbörjad” efter de definitioner som Boverket samt regeringen utformat. Det som också framkommit genom studien är att skillnaderna i PBL innan och efter 1 januari 2015 är stora, vilket bland annat innebär att kommunens förutsättningar att upprätta detaljplaner och exploateringsavtal har förändrats.

Abstract [en]

1st of January 2015 some changes were made in the Planning and Building Act. This was made because of the Swedish government wanted to make the planning process easier. The law changes include the planning process and the development contracts for detailed development plans. The transitional provisions, however, made a reservation to regulate the situations in which older legislation would be used. The regulation is that older legislation should be used if the detailed development plan were initiated prior to 1 January 2015. The purpose of this study is to investigate when a detailed development plan is initiated.  The study is based on current legislation and its application, this will be investigated using various methods. To interpret the law about the concept, legal dignity approach has been used through different interpretation methods. In order to gain an understanding of how the law is applied, a legal sociological approach has been used. This was done by conducting a questionnaire survey, where all the municipalities in Sweden were asked how they interpret the concept.  This has shown that the term is unclearly defined, as evidenced by the varying answers received from the municipalities in the survey. However, the majority of municipalities interpret the concept "initiate" according to the definitions that the National Board of Housing, Building and Planning and the government have formulated. What is also evident from the study is that the differences in the different legislation are large and that the municipality's conditions change significantly depending on when a detailed plan is "initiated". The study also shows that the units within the municipality interpret the term in a generally similar manner. The result of the legal interpretation and compilation of the survey shows that National Board of Housing, Building and Planning and the government's definitions of "initiated" detailed development plan are unclear. And that the existing definitions are in need of clarification for the application of these transitional rules by similar municipalities.  

Ort, förlag, år, upplaga, sidor
2017. , s. 51
Nyckelord [en]
Initiate, Planning and Building Act, transition rules, detailed development plan, development contracts, planning process.
Nationell ämneskategori
Annan samhällsbyggnadsteknik
Identifikatorer
URN: urn:nbn:se:hv:diva-11143Lokalt ID: EXM504OAI: oai:DiVA.org:hv-11143DiVA, id: diva2:1120415
Ämne / kurs
Lantmäteriteknik
Utbildningsprogram
Lantmäteriingenjör
Handledare
Examinatorer
Tillgänglig från: 2017-08-01 Skapad: 2017-07-06 Senast uppdaterad: 2017-08-21Bibliografiskt granskad

Open Access i DiVA

fulltext(5754 kB)372 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 5754 kBChecksumma SHA-512
3c63838c2a2c85456dcb15485704a19f9b6a0c3a86b9b13d754773870dd6a6c508647b284ee0305f3b381ea3f3b65cf468ae162773f2a95f920d5d69ffd41072
Typ fulltextMimetyp application/pdf

Av organisationen
Avdelningen för data-, elektro- och lantmäteriteknik
Annan samhällsbyggnadsteknik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 372 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 466 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf