Bygglovets giltighetstid: Och hanteringen av justeringar efter bygglovsbeslut
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avdelningen för data-, elektro- och lantmäteriteknik.
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avdelningen för data-, elektro- och lantmäteriteknik.
2016 (svensk)Independent thesis Basic level (degree of Bachelor), 10 poäng / 15 hpOppgaveAlternativ tittel
The period of validity of a building permit : And the management of adjustments after the permit has become valid (engelsk)
Abstract [sv]

Hur länge ett bygglov är giltigt finns reglerat i plan- och bygglagen (PBL) 9:43 som att den åtgärd ett bygglov avser ska ha påbörjats inom två år och avslutas inom fem år från den dag då bygglovet vann laga kraft. Huvudfrågan i studien handlar om svårigheten i att bedöma om åtgärden verkligen blivit påbörjad. Det finns ont om rättspraxis kring vad som avses med "påbörjats" vilket antagligen innebär att landets kommuner gör olika tolkningar i frågan. En annan fråga som studien behandlar är hur ändringar efter ett bygglovsbeslut hanteras. Rimligtvis händer det att byggherrar behöver göra justeringar under byggnationens gång.

Syftet är att undersöka hur kommunerna tolkar PBL 9:43 med avseende på begreppet "påbörjats" samt hur giltighetstiden för byggnationens påbörjande efterlevs. Vidare är syftet att ge en beskrivning av den rättsliga grunden för vad som avses med "påbörjats" i nu gällande lagstiftning. Studien ska även utreda om PBL ger möjlighet att justera bygglov under byggnationens gång och hur kommunerna hanterar sådana fall i praktiken.

Studien byggs upp av en juridisk analys som avser att beskriva de rättsliga grunderna kring bygglov och speciellt regeln i PBL 9:43. För att undersöka hur tvåårsfristen efterlevs genomfördes en kvantitativ undersökning av 500 bygglovshandlingar i sex kommuner. En enkätundersökning skickades ut till 75 kommuner för att ge svar på frågor kring kommunens tolkningar av "påbörjats" i PBL 9:43 och hanteringen av justeringar efter bygglovsbeslutet.

Resultatet av den juridiska analysen visar att det sannolikt krävs att ett arbete med byggnadens grund ska kommit igång för att byggnationen ska bedömas som påbörjad. Enkätundersökningen visar på stora skillnader i hur kommunerna tolkar "påbörjats" i PBL 9:43. Den visar även att häften av kommunerna inte gör någon aktiv kontroll av giltighetstiden för byggnationens påbörjande. Av undersökningen framgick även att det är vanligt förekommande att byggherrar vill göra justeringar under byggnationens gång och de flesta kommunerna hanterar det inom det befintliga bygglovet. Av bygglovsgranskningen framgick inget fall där startbesked lämnats efter tvåårsfristens utgång.

Slutsatser som dras i studien är bland annat att ett förtydligande av lagstiftningen troligtvis skulle ge en mer enhetlig bedömning av "påbörjats" i kommunerna, samt att det är oklart vilket stöd PBL ger för kommunernas hantering av justeringar av bygglov.

Abstract [en]

How long a building permit is valid is regulated in the Swedish planning and building act (PBL) 9:43. The validity of the permit is defined as the actual works with the building must be commenced in two years and ended in five years. The main question in this study is about the difficulty in assessing whether the actual works with the building has been commenced. There are few law cases that define the meaning of "commenced", which probably means that municipalities make different interpretations of the issue. Another question the study addresses is how changes in building permits are handled after the permit has become valid. Reasonably it happens that developers need to make adjustments of the building permit during the actual construction.

The aim of this study is to examine how municipalities interpret PBL 9:43 with respect to the term "commenced" and how the building permits limitation of two years is complied with. Furthermore, the purpose is to give a description of the legal basis of what is meant by "commenced" in the current legislation. The study also intends to investigate whether PBL provides the ability to adjust the building permit during the time of the construction, and how municipalities deal with such cases in practice.

The study is based on a legal analysis that aims to describe the legal grounds surrounding the building permit and especially the rule in PBL 9:43. To examine how the two-year period is complied, a quantitative survey of 500 building permit documents in six municipalities was completed. A questionnaire was sent out to 75 municipalities to provide answers to questions about the municipalities interpretations of "commenced" in PBL 9:43 and how adjustments of building permits are being handled.

The outcome of the legal analysis shows that work with a building's foundation is probably a requirement that is needed for the work to be assessed as "commenced". The questionnaire survey reveals large differences in how municipalities interpret "commenced" in PBL 9:43. It also shows that half of the municipalities do not perform any active controls of the building permit's two year limitation. The investigation reveals that it is common that developers make adjustments during the time of construction and that most municipalities deal with it within the existing building permit. The investigation of building permits shows no case where starting clearance was given after the two year limitation.

We conclude that a clarification of the legislation would likely provide a more uniform assessment of "commenced" in the municipalities. Likewise, it is unclear what support PBL provides considering adjustment after the building permit has become valid.

sted, utgiver, år, opplag, sider
2016. , s. 40
Emneord [en]
Community planning, building permit, period of validity, PBL 9:43, commenced, extension, adjustment
Emneord [sv]
Samhällsplanering, plan- och bygglagen, bygglovets giltighetstid, PBL 9:43, ”påbörjats”, förlängning, justering
HSV kategori
Identifikatorer
URN: urn:nbn:se:hv:diva-9869Lokal ID: EXM504OAI: oai:DiVA.org:hv-9869DiVA, id: diva2:967658
Fag / kurs
Land surveying
Utdanningsprogram
Lantmäteriingenjör
Veileder
Examiner
Tilgjengelig fra: 2016-09-12 Laget: 2016-09-09 Sist oppdatert: 2016-09-12bibliografisk kontrollert

Open Access i DiVA

fulltext(861 kB)640 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 861 kBChecksum SHA-512
1f31a6e1538a06ae690c51b59f41c502312a19437ff7e34a37cddd1cf75ec163729b2424e86786ab3795d689ed381c56c6788f14868a2e221838bc56d474d223
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 640 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 387 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf