Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Automation i Distributionsnät
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avd för elektro- och automationsteknik.
2012 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgaveAlternativ tittel
Distribution automation (engelsk)
Abstract [en]

As a part of Göteborg Energi’s work towards a smarter electric grid, the company has chosen to investigate the possibilities of automation in their middle voltage grid. In Europe, there are example cases where these technologies already are installed which many articles on the CIRED conference 2011 proved. Netcontrol Oy in Finland has, together with Tekla, created an automated SCADA system that Vattenfall in Finland today uses. The grid mainly consists of 10 kV open loop fed city grid and this automation is mainly designed for this type of grid. The intention of the automation is to when a fault occurs, the automation disconnects the faulted cable in the loop and then reconnects, this in as little time as possible in order to not make customers suffer.There are several different theories about how automation can be implemented, the two main principles are local automation and centralized automation. The local automation is implemented at station level with fault detectors that communicate with each other and thus disconnects a fault in the circuit using logic steps. This is the fastest option and Göteborg Energi has already installed several devices in the grid, which could make this option possible to realize. The other alternative is to let the SCADA do the sectionalizing using information from the indicators in the loop. This poses a problem though when the system becomes more complex. The operational staff might have problems with letting the SCADA make its own decisions and thereby lose control over the events in the grid. What the system could do instead is to make a suggestion on how the operational staff should handle the situation. However, the fault durations in this case will end at its best around 2-5 minutes and this makes the customer suffer for a longer time than the earlier principle.Hence, local automation is recommended, partly because it is today implemented in the grid and also because the fault duration is much shorter. This option can, with today’s technology disconnect a single-phase to ground fault without a power failure, and thus does no customer suffer during the fault. This should be supplemented with some sort of residual current compensation of the earth fault in order to remove the active fault current, thus minimizing the probability of a double earth fault or short circuit. Göteborg Energi should contact the suppliers of these devices and find out what they consider appropriate, and implement the technology in a loop as a pilot project to investigate its function.

sted, utgiver, år, opplag, sider
2012. , s. 27
Emneord [sv]
Automation, Distributionsnät, Kommunikation, Göteborg Energi, Driftsäkerthet
HSV kategori
Identifikatorer
URN: urn:nbn:se:hv:diva-4119OAI: oai:DiVA.org:hv-4119DiVA, id: diva2:487484
Fag / kurs
Electrotechnology
Utdanningsprogram
Elkraft
Uppsök
Technology
Veileder
Examiner
Tilgjengelig fra: 2012-02-08 Laget: 2012-01-31 Sist oppdatert: 2015-12-22bibliografisk kontrollert

Open Access i DiVA

automation_i_distributionsnat(1398 kB)1170 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1398 kBChecksum SHA-512
3700f7337c530980fe77cab3f10e8f7a35218c1c3f5fc740ea2ceba0a37e9624f4f816a58c85425bc9a18e0fc7a3823f5aae45004c5cf9d9493ebb70f0b7acf2
Type fulltextMimetype application/pdf

Søk i DiVA

Av forfatter/redaktør
Mård, Mathias
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 1172 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 634 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf