Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Ständiga förbättringar och praktisk problemlösning: en explorativ studie på Saab Automobile AB
Högskolan Väst, Institutionen för ingenjörsvetenskap.
2009 (svensk)Independent thesis Basic level (professional degree), 10 poäng / 15 hpOppgave
Abstract [en]

Continuous improvement is one of five principles in General Motors – Global Manufacturing System (GM-GMS). GM-GMS has been used by Saab Automobile AB since 2003 and is a central component for realisation of GM’s vision. Internal audits have discovered problems with one of the tools, practical problem solving (PPS), which needs to be improved. The department manufacturing of press and body (PK) wants to survey the problems and initiate a process of improvement. The purpose of this thesis work is to develop a foundation for future re-designs of the PPS process. Employees have been interviewed and observed in order to explore possible difference theoretical and practical problem solving with PPS. The result of the investigation shows 4 different and interrelated problem categories. 1. Information transfer, PPS hand over to product quality engineers (PQE) department cause problem when general assemblies (GA) are excluded from the improvement work. General assemblies do not get any feedback information from (PQE) about planed countermeasures. 2. Problem solving, team leaders has difficulties with identifying the true problem. Using “five-why” during the analysis work causes problem, since team leaders do not have the knowledge of how to use the tool in a proper way. 3. Documentation of PPS, the content in the PPS-form is a problem according to team leaders. Lack of knowledge and understanding of how to use the PPS-document leads to incomplete and incorrect analysis. 4. Coordination of involved people, support and help are missing from the management and quality engineer according team leaders. PPS from Global Costumer Audit are imposing time stress according to team leaders. Recommendations for further work is to investigate the opportunities with a web based PPS and process to improve information transfer and documentation of PPS. A second recommendation is to train and coach team leaders in problem solving and improve coordination of involved people and skills in problem solving.

sted, utgiver, år, opplag, sider
2009. , s. 45
Emneord [en]
Kaizen, GM-GMS, TPS, continuous improvement, PPS
HSV kategori
Identifikatorer
URN: urn:nbn:se:hv:diva-1638OAI: oai:DiVA.org:hv-1638DiVA, id: diva2:232724
Presentation
(engelsk)
Uppsök
Technology
Veileder
Examiner
Tilgjengelig fra: 2009-08-25 Laget: 2009-08-25 Sist oppdatert: 2009-10-09bibliografisk kontrollert

Open Access i DiVA

fulltekst(531 kB)1910 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 531 kBChecksum SHA-512
7216ac20f79654899172728a4637a962cb5a5d213d910b3e0a51f73111dbceff766f329542efbfd7da649459852060503325b4a09f3f9743d2316466db5b6d5c
Type fulltextMimetype application/pdf

Søk i DiVA

Av forfatter/redaktør
Sefton, Martin
Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 1912 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1028 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf