Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Analys av total felbortkopplingstid för 20-10/0,4 kV nätstationer med reläskydd
Högskolan Väst, Institutionen för ingenjörsvetenskap, Avdelningen för data-, elektro- och lantmäteriteknik.
2016 (svensk)Independent thesis Basic level (degree of Bachelor), 10 poäng / 15 hpOppgaveAlternativ tittel
Analysis of total fault clearance time for 20-10/04 kV substations with relay protection (engelsk)
Abstract [sv]

Med kablifieringen och anpassning till nya tekniska lösningar förändras uppbyggnad och egenskaper hos nätstationer i eldistributionsnätet. De övergår från traditionella nätstationer som är skyddade på högspänningssidan med säkringar och lastfrånskiljare till en ny uppbyggnad där de skyddas med reläskydd och brytare. En viktig parameter som ändras med teknikbytet är felbortkopplingstid vid felströmmar. Arbetets främsta uppgift är att ta reda på den nya totala felbortkopplingstiden för reläskydd och brytare. Med hjälp av den felbortkopplingstiden blir det möjligt att uppdatera selektivplan och fastställa selektivitet. För att uppnå arbetets mål togs relevant teori fram kring aktuell utrustning och kortslutningsströmmar. I syfte att bättre förstå nya nätstationer studerades närmare nätstationskonceptet Xiria med tillhörande reläskydd av typ WIC1-2P. I rapporten studerades enbart Fr-fuse vilken är en av reläskyddens funktioner som simulerar totalområdesäkring. Nätstationens brytare har relativt fast bryttid medan reläskyddens reaktionstid varierar beroende på kortslutningsströmmens storlek. För att ta reda på reaktionstiden gjordes först en teoretisk beräkning av den tiden som förväntas enligt tillverkarens manual. Därefter gjordes en laborationsprovning enligt sedvanligt sätt för reläskyddsprovning. Jämförelse av de två proven visade att de inte stämde överens. Som en konsekvens av avvikelserna genomfördes ytterligare prov i avsikt att undersöka samband mellan olika inställningars parametrar för reläskydden. Utfört sedvanligt provningssätt resulterade inte i förväntade utlösningstider, givet reläskyddets inställda parametrar. Detta implicerar bland annat att skyddet inte kan ställas in för överlast. Frågan gällande vilken provningsmetod för reläskydd som är lämplig kvarstår.

Abstract [en]

In pace with moving towards underground cables and adapting to new technological solutions the structure and properties of substations in the electric distribution network are changed. They shift from traditional substations that are protected on the high voltage side with fuses and disconnector to new designed constructions that are protected with relay-protection and circuit-breaker. An important variable that changes with implementing new technology is fault clearance time when fault current occur.The report's main task is to find the new total fault clearance time for relay protection and circuit-breaker. Using the result, it becomes possible to update the setting table and determine the selectivity. To find out the fault clearance time relevant theory of the related equipment and short-circuit current were obtained. In order to better understand the new substations, studies were made on the substation concept of type Xiria with belonged relay protection of type WIC1-2P. In the report analyses only Fr-fuse which is one of relay protections function that simulate General-purpose fuse were studied. MV switchboards have relatively fixed circuit breaker break-time while relay protectors reaction time varies depending on the strength of short-circuit current. To find out the reaction time a theoretical calculation of the time that is expected according to the manufacturer´s manual was performed. This was followed by a LAB-test in a usual way for relay protections test. The comparison of these two tests resulted in that they were not consistent. As a result of the differences an additional test was performed in order to analyze correlations between the different parameter settings for relay protection. By conventional testing we do not obtain the expected clearance time according to parameters set in the relay protection. This implies among other things that the protection can not be set for overload. The question of what the appropriate test for current relay protection is, remains.

sted, utgiver, år, opplag, sider
2016. , s. 40
Emneord [sv]
Eldistributionsnät, nätstationer
HSV kategori
Identifikatorer
URN: urn:nbn:se:hv:diva-9956Lokal ID: EXM505OAI: oai:DiVA.org:hv-9956DiVA, id: diva2:1010228
Fag / kurs
Electrotechnology
Utdanningsprogram
Elkraft
Veileder
Examiner
Tilgjengelig fra: 2016-10-03 Laget: 2016-10-03 Sist oppdatert: 2016-10-06bibliografisk kontrollert

Open Access i DiVA

fulltext(1228 kB)1686 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 1228 kBChecksum SHA-512
3847cc2d5f670f67e0901a8ceb05358a79f218a152e59a945a976ef568d89085ce7d67ba91e783d43b068ad9016af06ef2d56b9dda767c14afb2a71ddb9aa3cd
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 1687 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1233 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf